ALPHA SEED - SAMPLE JOB: GARAGE SUITE, 123 EXAMPLE STREET NW, CALGARY (FICTIONAL)
==================================================================================

What this is
------------
One construction job, start to finish, with the documents an AI office drafts for a
general contractor in Calgary, and the person who approves each one.

Everything is made up: the contractor (Example Builders Ltd.), the designer (Example
Design Co.), the owners, addresses, prices and dates. Phone numbers use the 555-01xx
range reserved for fiction. The drawings are not designed or reviewed by a registered
professional: not for permit, pricing or construction. Nothing here is legal advice.
The two voice notes are AI voices (ElevenLabs).

The job in six steps (the same six steps as the film "The Second Shift")
-------------------------------------------------------------------------
00 Inputs        Drawings Rev 0 (13 sheets) and a project manual excerpt, issued for
                 pricing Mon Jul 27, 2026.
01 The call      Mon Aug 3, 9:40 PM. The AI front desk answers after hours, qualifies
                 the job and books the site visit for Tue Aug 4, 8:00 AM.
02 Takeoff and   Thu Aug 6, 7:58 AM. The AI reads the drawings and the spec: takeoff
   spec          workbook (live formulas), 7 flags, spec review memo, RFI-001 and
                 RFI-002 (answered Aug 11).
03 The quote     Fri Aug 7. Drafted 9:12 AM, reviewed by the estimator 3:20 PM (two
                 changes), sent 3:40 PM.
04 Site day      Wed Oct 14. A 17-second voice note becomes change order CO-002 in four
                 minutes (signed by the owner Thu 9:05 AM). A one-minute voice note at
                 4:52 PM becomes daily report DR-026.
05 Billing       Fri Oct 30. Progress claim 2 goes out as a proper invoice under
                 Alberta's Prompt Payment and Construction Lien Act, with the payment
                 clock in a calendar file: day 14 (dispute notice), day 28 (payment
                 due), +7 days (subcontractors).

The numbers agree
-----------------
The drawings, the takeoff, the quote, the change order and the invoice come from one
model of the building, so they match. Quote Q-0146: $327,256.72 + GST. Alternate A1
(R-28 walls per spec): $4,240.00. Contract: $331,496.72. With CO-001 and CO-002:
$333,962.62. Prices are illustrative and come from a sample price book.

Files
-----
00_Inputs/sample-garage-suite-drawing-set-rev0.pdf
00_Inputs/sample-project-manual-excerpt.pdf
01_Call_2026-08-03/sample-after-hours-call-summary.pdf
01_Call_2026-08-03/sample-after-hours-call-transcript.txt
01_Call_2026-08-03/sample-site-visit.ics
02_Takeoff-and-spec_2026-08-06/sample-construction-takeoff.xlsx
02_Takeoff-and-spec_2026-08-06/sample-takeoff-summary-TO-0146.pdf
02_Takeoff-and-spec_2026-08-06/sample-spec-review-memo.pdf
02_Takeoff-and-spec_2026-08-06/sample-rfi-001-002.pdf
03_Quote_2026-08-07/sample-construction-quote-Q-0146.pdf
04_Site-day_2026-10-14/sample-voice-note-change-request.mp3
04_Site-day_2026-10-14/sample-change-order-CO-002.pdf
04_Site-day_2026-10-14/sample-voice-note-daily-report.mp3
04_Site-day_2026-10-14/sample-voice-notes-transcripts.txt
04_Site-day_2026-10-14/sample-daily-site-report-DR-026.pdf
05_Billing_2026-10-30/sample-proper-invoice-INV-1088.pdf
05_Billing_2026-10-30/sample-payment-clock-INV-1088.ics

Each drawing sheet is also available as its own PDF on the page.

Made by Alpha Seed Inc., Calgary, Alberta.
The page for this sample job: https://alphaseed.ca/construction-ai-system/
Book a demo: https://alphaseed.ca/book-a-demo/
