For general contractors and home builders in Alberta

The construction AI system: from the after-hours call to the paid invoice.

It answers the calls, reads the drawings and the spec, drafts the takeoff and the quote, turns voice notes into change orders and daily reports, and checks every invoice before it goes out. Your people approve and sign.

Built in Calgary. The AI drafts; prices, judgement and signatures stay with your people.

Read the script
  1. In Calgary, every contractor works two shifts.
  2. The first one is on site.
  3. The second starts after dinner.
  4. Missed calls. A 400-page spec.
  5. A quote due Friday. An RFI nobody answered.
  6. A change order on the back of a receipt.
  7. And an invoice that has to be perfect, or the 28-day payment clock never starts.
  8. Alpha Seed builds AI that works the second shift.
  9. It answers every call and books the site visit.
  10. Reads the spec and flags what could hurt you.
  11. Drafts the takeoff and the quote. Your estimator checks it.
  12. Logs every change the day it happens.
  13. Turns a two-minute voice note into the daily report.
  14. Sends proper invoices and watches every deadline.
  15. You still run the job. You still sign.
  16. You just get your evenings back.
  17. Alpha Seed. AI for the office side of construction. Built in Calgary.
  18. Book a demo at alphaseed.ca.

An illustrative example. The contractor, the job and the paperwork in the film are invented. The sample job on this page follows the same six steps with real files, and it’s fictional too. Drawn in code, no stock footage; the voice is AI-generated.

What changes on a job

Alpha Seed builds a construction AI system for general contractors and home builders in Calgary and across Alberta. It answers the after-hours call and books the site visit, reads the drawings and the spec and flags what could hurt the job, drafts the takeoff and the quote for your estimator, turns voice notes into change orders and daily reports, and checks every progress claim against Alberta's proper invoice rules. A person approves everything that goes out. The sample job below shows each step with the real files.

After-hours call
9:40 → 9:44 PMA call at 9:40 PM is answered, qualified and booked for an 8 AM site visit, with a one-page summary waiting for the estimator.
Before the quote
9 flagsFound in the drawings and the spec before the quote went out. Two became RFIs; the rest were priced or written into the quote.
A change on site
1:30 → 2:20 PMThe owner asks for a window on site. A priced change order with a marked-up plan is signed by the PM within the hour.
Progress claim
8 of 8Proper invoice items checked before progress claim 2 goes out, with day 14 and day 28 in the calendar.

Times and counts from the sample job below, a fictional garage suite in Calgary. On your jobs we measure before and after during the pilot.

Book a 20-minute demo

Tell us what kind of building you do. A person replies within one business day to set a time.

We reply within one business day.

Download the sample job

Free, no email. One fictional job from the first call to the second progress claim: a backyard suite above a double garage in Calgary. Every file comes from the same model of the building, so the drawings, the takeoff, the quote, the change order and the invoice agree with each other.

13 sheets · 11 × 17 in · PDF

The drawing set

Site, foundation, both floors, roof, four elevations, sections, details, schedules and the framing plans, issued for pricing: the set the takeoff and the quote come from.

  1. Sheet A-000, cover sheet, project data and notes, from the sample garage suite drawing set A-000 Cover sheet, project data and notes Project data for a 624 SF suite above a double garage on an R-CG lot, the drawing list and the general notes. PDF · 119 KB
  2. Sheet A-100, site plan, from the sample garage suite drawing set A-100 Site plan The lot and the lane, the 1.52 m rear and 1.22 m west setbacks, grades and the site notes. PDF · 119 KB
  3. Sheet S-101, foundation plan, from the sample garage suite drawing set S-101 Foundation plan Footings, walls and both slabs, with the reinforcing and the 25 MPa concrete the spec disagrees with. PDF · 1,014 KB
  4. Sheet A-101, level 1 plan (garage), from the sample garage suite drawing set A-101 Level 1 plan (garage) The double garage, the 16-foot overhead door, the stair and the 1-hour separation from the suite. PDF · 120 KB
  5. Sheet A-102, level 2 plan (suite), from the sample garage suite drawing set A-102 Level 2 plan (suite) Kitchen, bath, bedroom, laundry and mechanical, with the smoke and CO alarms. PDF · 122 KB
  6. Sheet A-103, roof plan, from the sample garage suite drawing set A-103 Roof plan 4:12 trusses, 18-inch overhangs, 797 SF of roof and the ice and water membrane at both eaves. PDF · 117 KB
  7. Sheet A-201, elevations: north and south, from the sample garage suite drawing set A-201 Elevations: north and south The lane and yard sides, with levels, grades and the door and window marks. PDF · 138 KB
  8. Sheet A-202, elevations: east and west, from the sample garage suite drawing set A-202 Elevations: east and west The two side walls, including the west wall 1.22 m from the property line. PDF · 138 KB
  9. Sheet A-301, building sections, from the sample garage suite drawing set A-301 Building sections Levels from slab to ridge, the I-joist floor and the 16-inch raised-heel trusses. PDF · 209 KB
  10. Sheet A-401, details and assemblies, from the sample garage suite drawing set A-401 Details and assemblies Eave, floor and wall details, including the overhang that needs two courses of membrane. PDF · 203 KB
  11. Sheet A-501, schedules and stair, from the sample garage suite drawing set A-501 Schedules and stair Door and window schedules, the wall, floor and roof assemblies, and the stair. PDF · 120 KB
  12. Sheet S-201, level 2 floor framing plan, from the sample garage suite drawing set S-201 Level 2 floor framing plan 14-inch I-joists at 16 inches, and the header over the overhead door left to the supplier's engineer. PDF · 117 KB
  13. Sheet S-202, roof framing plan, from the sample garage suite drawing set S-202 Roof framing plan Trusses at 24 inches, a clip at every truss and the 16-inch raised heel. PDF · 116 KB
  14. ZIP · 2.6 MB Everything, in one ZIP The drawing set, the project manual excerpt and every file below, in dated folders from the call to the invoice, with a read-me that tells the story. Download everything

The paperwork, from the call to the invoice

Change order CO-002, Oct 14

The owner asks for a window on site. The superintendent's voice note becomes a priced change order with a marked-up plan, signed by the PM at 2:20 PM.

The voice note it came from, 0:17 (AI voice)

A fictional job: the company, the people, the addresses and the prices are invented, and every file says SAMPLE. The drawings were not designed or reviewed by a registered professional: not for permit, pricing or construction. Free to use as a reference, without warranty.

Where construction jobs stall

Not on site. In the office, after the site day is done.

  1. The office work happens at night

    Owners and PMs run the site all day. Calls, specs, quotes and invoices wait until after dinner, and the ones that wait longest are the ones that pay.

  2. Small misses cost real money

    A header that isn't sized. A slab spec that disagrees with the drawings. A change agreed on a site walk and never written down. Each one comes back later as a cost nobody priced.

  3. The payment clock needs a proper invoice

    In Alberta the owner's 28 days start when they receive a proper invoice, and a dispute has to be raised within 14 days. A missing item gives them a reason to wait.

None of it is hard for your people. It's slow because it's reading, counting, typing and chasing, and it lands on the same few people every night. That's the part the AI takes.

  • Alberta’s construction industry needs to add about 48,800 workers by 2035, mostly to replace 43,700 retirements (BuildForce Canada).
  • Calgary housing starts fell 20% from Q2 2025 to Q2 2026 (City of Calgary), so more contractors are bidding for each job.
  • Project teams spend about 14 hours a week looking for information, sorting out conflicts and fixing mistakes (FMI, a U.S. survey).
  • 9.2% of Canadian construction businesses used AI to deliver their work in the past year, against 19.2% of all businesses (Statistics Canada, Q2 2026).

One job, start to finish

The six steps from the film, on the sample job: what the AI did and who approved it. Each step links to its files above.

  1. 01 Mon Aug 3, 9:40 PM

    The after-hours call

    AI Answers after hours and says it is an AI. Asks what a good estimator would ask: drawings, permits, timing, budget, truck access. Books the site visit for 8 AM and texts the owner a link to upload the drawings.

    Your people Alex, the estimator, reads a one-page summary before the 8 AM site visit.

    See the sample: the call summary, the transcript and the invite

  2. 02 Thu Aug 6, 7:58 AM

    The drawings and the spec

    AI Reads the 13 sheets and the project manual. Flags three contract risks (payment 45 days after "approval", $250 a day in liquidated damages, winter heat at the contractor's cost) and two places where the drawings and the spec disagree. Drafts two RFIs.

    Your people Alex approves the RFIs at 8:40 AM. The designer answers on Aug 11.

    See the sample: the spec review memo and the two RFIs

  3. 03 Fri Aug 7, 3:40 PM

    The takeoff and the quote

    AI Measures and counts from the drawings: 188 2x6 studs, 500 LF of I-joists, 14 trusses, 797 SF of roof, 1,920 SF of Type X drywall. Every quantity is a live formula that points to a sheet. Prices it from the price book and drafts quote Q-0146.

    Your people Alex changes two inputs (siding waste from 8% to 10%, and the framing labour rate), approves at 3:20 PM and sends at 3:40.

    See the sample: the takeoff workbook and quote Q-0146

  4. 04 Wed Oct 14, 2:10 PM

    A change order the same day

    AI Turns the superintendent's voice note into change order CO-002: scope, price at cost plus 10%, schedule, a marked-up plan and a flag. The west wall is 1.22 m from the property line, so the designer confirms spatial separation before the window is ordered.

    Your people Morgan, the PM, signs at 2:20 PM. The owner e-signs at 9:05 the next morning, before the wall is closed.

    See the sample: change order CO-002 and the voice note

  5. 05 Wed Oct 14, 4:52 PM

    The daily report

    AI Writes daily report DR-026 from a one-minute voice note and 12 photos: weather, crew and hours, work done, deliveries, safety, changes and tomorrow's plan.

    Your people Jordan, the superintendent, reads it and approves at 5:10 PM.

    See the sample: daily report DR-026 and the voice note

  6. 06 Fri Oct 30, 10:52 AM

    The proper invoice

    AI Builds progress claim 2 from the schedule of values, the daily reports and the change orders. Checks the eight items Alberta lists for a proper invoice. Puts day 14 and day 28 in the calendar.

    Your people Casey, the controller, approves at 10:40 AM and it goes out at 10:52. $75,540.06 is due Fri Nov 27.

    See the sample: proper invoice INV-1088

Inside the drawings

Four details from the sample set. Click a picture to open its sheet.

Axonometric drawing of the sample garage suite: a two-storey building with a double garage door below and the suite above.
One model, thirteen sheets. The drawings, the takeoff, the quote and the invoice come from the same building, so the numbers agree.
Building section of the garage suite with levels, the I-joist floor and the raised-heel roof trusses.
Levels from the sections. Wall heights, the 14" I-joist floor and the 16" raised heel set every vertical quantity.
Part of the level 2 floor framing plan, with the header over the overhead door marked as not sized.
What isn't shown gets flagged. No size for the header over the 16' overhead door: priced as an allowance and sent to the supplier's engineer.
Eave detail with the roof overhang, the ice and water membrane and the wall below.
Details checked against the spec. An 18" overhang needs two courses of ice and water membrane to reach 12" inside the wall.

From the sample job. A fictional project; the drawings were not designed or reviewed by a registered professional.

What the AI flagged on this job

Before the quote went out. Each flag says where it came from and how it was handled.

FlagItemWhat it was and how it was handled
F-01Header over the overhead doorNot sized on any sheet. Priced as a 3-ply LVL allowance.
F-02Garage slabDrawings say 25 MPa, the spec 32 MPa air-entrained (C-2). Priced per the spec, RFI-001.
F-03Wall insulationDrawings say R-24, the spec R-28. Alternate A1, RFI-002.
F-04Ice and water membraneOne course is not enough at an 18-inch overhang. Two priced.
F-05Winter heat and hoardingAt the contractor's cost in the spec. Carried as a $6,500 allowance.
F-06Stair risersDepend on the as-built floor height. Checked on site Oct 14.
F-07Owner allowancesCabinets, appliances, fixtures and flooring carried at the spec's values.
R-1Payment terms45 days "after approval" in the contract, against 28 days after a proper invoice is received.
R-2Liquidated damages$250 a day after Dec 18. The quote asks for weather and permit extensions.

Bring a plan set you've already bid

In the demo we walk through the sample job, then one of your own jobs, so you can compare the AI's drafts with what you actually sent.

What stays with your people

The AI drafts. Everything that carries your name stays where it is.

Prices
Your price book, your crew rates and your markup. The AI prices from them; your estimator decides.
What reaches an owner
Quotes, RFIs, change orders and invoices go out only after a person approves them.
Judgement and signatures
Design, engineering and the seal stay with your designer and your engineer. The AI never signs.
Your files
Your drawings, specs and documents stay yours. We connect only what you choose.

Built for Alberta

The rules the system works to. Your lawyer and your designer confirm what applies to each contract and each job.

Code or ruleWhat it covers
Prompt Payment and Construction Lien ActEvery progress claim carries the eight items Alberta lists for a proper invoice. Day 14 (notice of dispute), day 28 (payment due) and 7 days to pay subcontractors are tracked, with the 10% holdback and the 60-day lien period.
National Building Code – 2023 Alberta EditionDrawings and specs are read against the code in force since May 1, 2024. Conflicts go out as RFIs, not guesses.
City of Calgary inspectionsNothing gets covered before it's inspected. Daily reports show what's ready for which inspection.
OHS Code, Part 9Fall protection where a worker can fall 3 m or more. The daily report records the toolbox talk and the signed hazard assessment.

Who it's for

A good fit

  • General contractors and home builders in Calgary and across Alberta
  • Garage and backyard suites, infills, additions, renovations and light commercial work
  • Offices where the owner or the PM does the estimating at night
  • Crews that already send texts, photos and voice notes

Tell us first if

  • You run large commercial or industrial jobs with a full project-controls team. We’ll say on the call what fits and what doesn’t.
  • You need stamped design or engineering. We don’t provide it; the system works with your designer and engineer.
  • You mostly need the phone answered and reviews collected. Our home renovation page covers after-hours calls, booking and Google Maps.

How we start

  1. A 20-minute demo

    The sample job, then a plan set you've already bid. We say which step we'd set up first, and what we wouldn't.

  2. One step, on your own data

    Usually the after-hours call or the takeoff and quote first, set up on your price book and your templates, and tested on jobs you've already bid before it touches a live one.

  3. A 90-day paid pilot

    One fixed monthly price in writing, then month to month with 30 days’ notice. In Canadian dollars, GST extra. How pricing works.

Questions contractors ask

Is the sample a real job?

No. The company, the people, the addresses and the prices are made up, and every file is marked SAMPLE. The documents are the kind the AI drafts, and the numbers agree from the drawings to the invoice.

Does it replace my estimator or my PM?

No. It does the reading, the counting and the first draft. Your estimator checks and prices. Your PM approves and signs. Nothing goes to an owner without a person’s approval.

How accurate is the takeoff?

It counts what’s on the drawings and flags what isn’t clear, and every quantity points back to a sheet. Your estimator approves every bid. We test it first on jobs you’ve already bid, against your own numbers.

Can it use my price book and my templates?

Yes. The prices in the sample are illustrative. On your jobs it prices from your book, your labour rates and your terms, on your letterhead.

Do my supers need a new app?

No. They send voice notes, photos and texts the way they do now.

Is the proper invoice check legal advice?

No. It checks each invoice for the eight items Alberta lists and tracks the dates. Contract terms are for your lawyer.

Does it work with my accounting or project software?

We check your setup in the demo and say what connects directly and what needs an export. We don’t promise an integration before we’ve seen it.

What does it cost?

It depends on your volume and which steps you want covered. After the 20-minute demo we send one fixed monthly price in writing for a 90-day paid pilot, then month to month with 30 days’ notice. In Canadian dollars, GST extra. How pricing works.

Can we talk in Vietnamese?

Yes. We work in English and Vietnamese.

Book a 20-minute demo

Tell us how a job moves through your office. A person replies within one business day to set a time, and after the call you get a written quote.

  1. You tell us how a job moves today, from the first call to the last progress claim.
  2. We walk through the sample job and one of yours: the takeoff, the quote and the paperwork it would produce.
  3. We say what we’d set up first, and what isn’t worth paying for yet.
  4. You get a written quote: one fixed monthly price for the scope we agreed.
Alpha Seed Inc.
407 9 Ave SE
Calgary, AB T2G 2K7
support@alphaseed.ca
Weekdays, 9 to 5, Calgary time

We're in Calgary, on Mountain Time. Weekdays, 9 to 5, Calgary time. We reply within one business day.

We reply within one business day.

Sources

Every figure on this page, where it comes from and when we read it.