For architecture firms in Calgary and Alberta

From lot to permit. The agents draft. Your architects decide.

AI agents that read a lot's zoning and draft site options, redraw the plans after your mark-up, check the permit package against the City's checklist and draft an answer to every review comment.

Built in Calgary. The agents draft and check; design decisions, signatures and the seal stay with your architects.

Read the script
  1. Picture an architecture firm in Calgary.
  2. A developer sends an address, and one question: what can we build here?
  3. Usually, that answer takes a week. The permit takes months.
  4. This time, an Alpha Seed agent reads the lot's zoning: height, setbacks, density.
  5. By the afternoon, it has drafted three options, with units and parking for each.
  6. The architect picks one, and marks what to change.
  7. The agent redraws the plans.
  8. Before anything is submitted, it checks the package against the City's requirement list.
  9. One missing signature. Fixed.
  10. Weeks later, the City's review comes back: 27 comments.
  11. The agent matches each one to its sheet, and drafts the answers.
  12. Four need a design decision. Those wait for the architect.
  13. She decides, signs, and it goes back in three days.
  14. The agents draft. The architect decides, and seals.
  15. Alpha Seed. AI for the complex work in construction. Built in Calgary.
  16. Book a demo at alphaseed.ca.

A dramatized example. The firm, the lot, the people and every figure are fictional, and the times are estimates (sources). The documents on screen are mock-ups: the red stamp is the architect’s drawing status, not a City approval, and no seal is shown. Drawn in code, no stock footage; the voice is AI-generated. The project continues in the sample files.

What changes on a project

Alpha Seed sets up AI agents for architecture firms in Calgary and across Alberta. They read a lot's zoning and draft site options with suites and parking, redraw the chosen option after your architect's mark-up, check the permit package against the City's checklist before you submit, and draft an answer to every review comment. Your architects make the design decisions, sign and seal. On a project like the sample below, we estimate site options drop from about a week to an afternoon, and a review response from about two weeks to three days.

Site options
1 week → 1 afternoonFrom an address to three massing options with suites, parking and floor area, ready for your architect to choose.
Review response
2 weeks → 3 daysFrom the City's detailed review to a signed response, every comment answered and tied to its sheet.
The City's part
UnchangedCirculation and decision times stay with the City. The agents shorten your side: incomplete packages and slow answers.

Estimates for a project like the sample: a six-storey mixed-use building in Calgary. Your numbers depend on your projects, so we measure them with you during the pilot. Sources are at the bottom of the page.

Book a 20-minute demo

Tell us what kind of projects you design. A person replies within one business day to set a time.

We reply within one business day.

Where architecture projects stall

Not at the drawing board. In the paperwork between the drawings and the permit.

  1. The zoning keeps moving

    Council repealed citywide rezoning on April 8, 2026, and on August 4 almost every property went back to the zoning it had before. A new Zoning Bylaw is being written to replace Land Use Bylaw 1P2007. Feasibility done before August needs a second look, and each change makes "what can we build here?" a longer answer.

  2. An incomplete package costs a month

    Every building permit application is prescreened. If anything is missing, the applicant gets 30 days to provide it, and the application may be refused if it doesn't arrive. The checklists exist; checking a full set against them, sheet by sheet and form by form, is the slow part.

  3. The review clock counts your days too

    A multi-disciplinary development permit took 114 days on average from July to September 2026, against a 120-day target. The City counts the applicant's review and response time inside that number, so a review letter that waits two weeks for answers adds two weeks. For a new mixed-use building, the City's own estimate is 13 to 14 months of approvals.

None of this needs an architect's judgement until a design question comes up. It's reading, checking, cross-referencing and retyping. That's the part the agents take.

How the agents work on a project

Six steps, in the same order as the film. At every step the agent drafts and your architect decides.

  1. 01 Zoning

    Read the lot

    AI Reads the parcel's land use district, the bylaw rules and the plan policies that apply, and draws the buildable envelope: height, setbacks, floor area. Direct Control districts and anything unclear go on a list of questions instead of being guessed.

    Your people Your architect confirms the reading.

    See the sample: the site options report (PDF)

  2. 02 Options

    Draft the options

    AI Draws two or three massing options, with suites, storeys, parking and floor area for each, and the trade-offs side by side.

    Your people Your architect picks one and marks what to change.

    See the sample: options A, B and C (PDF)

  3. 03 Drawings

    Redraw the plans

    AI Redraws the chosen option after the mark-up: suite layouts on every floor, the parkade, roof, elevations, sections and a shadow study, in your title block. Suites, areas and stalls are counted from the drawings, so the schedules match the sheets.

    Your people Your architect reviews the set the way they'd review a junior's or a consultant's.

    See the sample: the 13-sheet drawing set (PDF)

  4. 04 Package

    Check before submitting

    AI Checks the package against the City's checklist for that application type, and the drawings against each other and the form: sheet list, titles, areas, the building classification, signatures.

    Your people Your team fixes what's missing and submits.

    See the sample: the package pre-check (PDF)

  5. 05 Review

    Answer the review

    AI Splits the City's review letter into tracked comments, matches each one to its sheet, and drafts the answers and the drawing revisions. When a comment needs a design decision, it lays out the options and what each costs in suites or area, then waits.

    Your people Your architect decides the design questions, edits and signs.

    See the sample: the response to 27 comments (PDF)

  6. 06 Issue

    Re-issue the set

    AI Updates the sheet list, the revision clouds and the transmittal for the re-issue, and keeps the comment log for the next round. It never applies a seal.

    Your people Your architect seals and issues the drawings as the architect of record.

    See the sample: the comment tracker and schedules (Excel)

Download the sample project

Lot 7 is a fictional six-storey mixed-use building in Calgary, the project from the film. One model produced every file, so the numbers agree from file to file: 68 suites, 43 parking stalls, a floor area ratio of 2.73. Open them the way you'd open a consultant's set.

Download the whole project (ZIP)

ZIP · 2.2 MB · 6 files and a read-me · PDF, Excel and DXF · free, no email needed

  1. Cover of the site options report, What can we build here?, with three massing options: A a bar, B an L with a courtyard, C two blocks

    1 · What can we build here?

    Site options report

    Three massings on the lot, each with suites, storeys, parking and floor area, the zoning envelope they fit and the trade-offs, for the architect to choose from.

    PDF · 485 KB · 7 pages, 11 × 17

  2. Cover sheet A-000 of the drawing set with the massing view, the drawing list and the project data tables

    2 · After the architect's mark-up

    Development permit drawing set

    Option B, redrawn: site plan, parkade, every floor with suite layouts, roof, four elevations, two sections, enlarged suites and a shadow study, in a full title block.

    PDF · 1.7 MB · 13 sheets, 24 × 36

  3. The typical floor plan in a CAD viewer, with walls, doors, fixtures, grids and suite labels on a dark background

    2 · Editable

    Typical floor plan (CAD)

    Levels 2 to 5 as a DXF in millimetres: walls, doors, glazing, fixtures, suite areas, grids and dimensions, each on its own layer.

    DXF · 260 KB · AutoCAD 2018 format

  4. The comment tracker sheet: each City comment with its sheet, the response, who prepared it, the status and the days to answer

    3 · Counted from the drawings

    Schedules and comment tracker

    Areas by level, the suite list, parking against requirements, the three options, the package check and the 27-comment tracker, all with live formulas.

    Excel · 27 KB · 8 sheets

  5. Package pre-check summary: 8 of 9 required items complete, the applicant's signature missing and then signed, 12 of 13 consistency checks passed the first time

    4 · Before submitting

    Package pre-check

    The set and the application checked against the City's checklist and against each other. One item was missing, the applicant's signature, and it was fixed before submission.

    PDF · 231 KB · 2 pages

  6. First page of the letter responding to the detailed team review, with the summary of changes and the architect's signature

    5 · After the City's review

    Response to the City's review

    All 27 comments of a detailed review answered, each tied to its sheet: 23 drafted by the agent, 4 decided by the architect, signed and sent three days later.

    PDF · 391 KB · 5 pages

A fictional project: the firm, the client, the lot, the zoning values and the City review are invented. The drawings are illustrations, not for construction, permit or tender, and carry no seal. Nothing here is legal or code advice.

Inside the sample project

Four close-ups from the files above. Each one opens the file it comes from.

Close-up of the typical floor plan at 1:100: two-bedroom suites on both sides of the corridor with doors, kitchens, bathrooms and closets drawn, suite tags with areas, and red revision clouds
Every suite laid out. The typical floor at 1:100: doors, kitchens, bathrooms and closets drawn, each suite tagged with its type and area, and the architect's mark-up clouded as revision 1.
Close-up of the south elevation: a brick base with storefront glazing, light panels, wood-look balcony bays, the dark Level 6 stepback and the maximum height line above
Four elevations. Materials keyed M1 to M6, the storefronts and balconies, the Level 6 stepback and the 22 m height line from the zoning.
Shadow study panels for March 21 and June 21 at 10:00, 13:00 and 16:00, with the new building's shadow hatched over the neighbouring lots
Shadow study. March, June and September 21 at 10:00, 13:00 and 16:00, with the sun's position computed for Calgary.
A page of the response letter: comments 2 to 6 with the City's comment, the answer and the revised sheets, and comment 5 marked Architect decision with the options the agent laid out
27 comments, answered. Each City comment, its answer and the sheets revised. Comment 5 needed a design decision: the agent laid out the options, the architect chose.

From the sample project. Every name and value is invented; the drawings are illustrations, not a design for construction.

Bring one of your own review letters to the demo

Take out anything confidential. In 20 minutes we show how the agents would track it, match each comment to its sheet and draft the answers, and which step we'd set up first.

What stays with your architects

The agents prepare the work. The decisions and the responsibility stay where they are.

Design decisions
Which option, which suite mix, what to change. When a review comment needs a decision, the agent lays out the options and waits.
The seal
Only an architect registered with the Alberta Association of Architects may seal architectural documents. The agents never apply a seal; the seal box on every sample sheet is empty for that reason.
What leaves the office
Nothing goes to the City, a client or a consultant until someone on your team approves it.
The City's timeline
Circulation, notice and appeal periods stay as they are. The agents shorten your side: incomplete packages and slow answers.

Built for Calgary's process and Alberta's rules

What the agents check against. Your architect confirms what applies to each project.

Code or ruleWhat it covers
Land Use Bylaw 1P2007Calgary's zoning bylaw: districts, height, setbacks, density and parking. The City is writing a new Zoning Bylaw to replace it.
The repeal of citywide rezoningCouncil repealed it on April 8, 2026, and almost every property went back to its previous zoning on August 4, 2026.
The City's application checklistsWhat each application type has to include. A building permit application that's missing information gets 30 days to be completed and may be refused after that.
National Building Code – 2023 Alberta EditionAlberta's building code, in force since May 1, 2024: occupancy, fire separations, exits and accessibility.
National Energy Code of Canada for Buildings 2020Energy efficiency for buildings outside Part 9, in force in Alberta from the same date.
Architects Act (Alberta)Registration with the Alberta Association of Architects is mandatory to practise architecture, and only registered members may affix an architect's seal to architectural documents.
RAIC statement on AI, April 28, 2026AI may assist, but it doesn't replace the architect's duty of care, professional judgment, ethical responsibility or accountability.

Who it's for

A good fit

  • Architecture firms of 5 to 50 people in Calgary and across Alberta
  • Multi-family, mixed-use, commercial, infill and office-to-residential conversion projects
  • Firms that take several projects a year through development and building permits
  • Studios where senior people spend their evenings on review letters, checklists and schedules

Tell us first if

  • You want the AI to design the building. It drafts options and documents; your architects make the design decisions.
  • Your projects never go through a Calgary permit. The checks are built around the City’s process; elsewhere in Alberta we start from the municipality’s own checklists.
  • You’re a large firm with its own automation team. We’ll say on the call what we’d add and what you already have.

How we start

  1. A 20-minute demo

    Bring a review letter or an address. We show what the agents would do with it, which step we'd set up first, and what we wouldn't.

  2. One step, on one live project

    Usually the package check or the review response first, set up on your title block, your sheet list and your standards, and tested on a past project before it touches a live one.

  3. A 90-day paid pilot

    One fixed monthly price in writing, then month to month with 30 days’ notice. In Canadian dollars, GST extra. How pricing works.

Questions architects ask

Can AI really design a building?

It can draft early design quickly: massing options that fit the zoning, suite layouts, unit counts and parking. It can’t make the design judgement or carry the responsibility for it. In every sample file, the decisions are the architect’s.

Does it replace our technologists or our architects?

No. The agents do the reading, checking and drafting. Your team decides, edits and signs, and your architect seals. The hours saved go back into design.

Will the City accept responses prepared with AI?

The City reviews what you submit, and your architect stays responsible for it. The agents prepare drafts and checks; your team edits, approves and signs. The RAIC said the same in April 2026: AI may assist, but it doesn’t replace the architect’s duty of care.

Does it work with our software?

The agents work from what your software already exports, such as PDF sets, sheet lists and schedules, and hand back PDF, Excel and DXF, as in the sample project. In the demo we check what connects directly and what needs an export.

Who seals the drawings?

Your architect. In Alberta, only architects registered with the Alberta Association of Architects may seal architectural documents. The agents never apply a seal; the seal box on every sample sheet is empty for that reason.

Where do you usually start?

With the package check or the review response. They’re heavy on paperwork, easy to measure, and they teach the agents your standards before they draft anything.

What does it cost?

It depends on your projects, your volume and which steps you want. After the 20-minute demo we send one fixed monthly price in writing for a 90-day paid pilot, then month to month with 30 days’ notice. In Canadian dollars, GST extra. How pricing works.

Is Lot 7 a real project?

No. The firm, the client, the lot, the zoning values and the City review are fictional, and the times are estimates. The work is real: one model drove every drawing, report and table in the sample, which is why the numbers agree from file to file.

Can we talk in Vietnamese?

Yes. We work in English and Vietnamese.

Book a 20-minute demo

Tell us about your projects. A person replies within one business day to set a time, and after the call you get a written quote.

  1. You tell us how a project moves today, from the first call about a lot to the permit.
  2. We walk through a project like yours: the site options, the package check and the review response it would produce.
  3. We say what we’d set up first, and what isn’t worth paying for yet.
  4. You get a written quote: one fixed monthly price for the scope we agreed.
Alpha Seed Inc.
407 9 Ave SE
Calgary, AB T2G 2K7
support@alphaseed.ca
Weekdays, 9 to 5, Calgary time

We're in Calgary, on Mountain Time. Weekdays, 9 to 5, Calgary time. We reply within one business day.

We reply within one business day.

Sources

Every figure on this page, where it comes from and when we read it.

  • Approval times: City of Calgary, Development approval timelines, July 1 to September 30, 2026 (multi-disciplinary development permits: 114 days on average, 120-day target, 65% within target; “The total days include both City and Applicant review and response times”). Read November 21, 2026.
  • Time to start building: City of Calgary, Timelines (a new mixed-use building: 13 to 14 months on average, if the applications are ready and the land use is in place). Read November 21, 2026.
  • Prescreen and 30 days: City of Calgary, Permit process FAQ. Read November 21, 2026.
  • Rezoning: City of Calgary, Rezoning for Housing (repealed April 8, 2026; in effect August 4, 2026). The new Zoning Bylaw: City of Calgary, City Building Program. Read November 21, 2026.
  • Codes in force: Government of Alberta, Building codes and standards (NBC–AE 2023 and NECB 2020 from May 1, 2024).
  • The seal: alis, Architect (Architects Act and General Regulation). Read November 21, 2026.
  • AI and professional responsibility: RAIC, Statement on artificial intelligence in architecture, April 28, 2026.
  • Shadow study: sun positions from NOAA’s General Solar Position Calculations.
  • The times in the film and on this page (site options in an afternoon instead of about a week; a review response in three days instead of about two weeks) are Alpha Seed’s estimates for a project like the sample. They are not measurements from a client.