The framing AI system: from the plans to getting paid.
It reads the builder's plans and does the takeoff wall by wall, prices the bid at your rates, turns every extra into a signed change order, and bills every draw the way Alberta's prompt payment rules require.
Built in Calgary. The AI does the paperwork; your prices, your approvals and the framing stay with your people.
- 0:00Friday, 4 p.m.: 40 pages of plans, bid due Monday
- 0:12The AI reads the plans and does the takeoff
- 0:24Flags, checked, approved: the bid goes out the same day
- 0:32Week 3: a voice note becomes a signed change order
- 0:47Draw 2: a proper invoice and the 28-day clock
- 1:00Paid
- 1:02Same crews, more bids out
- 1:10Alpha Seed
Jump to a chapter, read how each step works, or download every file from the film’s job.
Read the script
- Picture a framing contractor in Calgary.
- Friday, 4 p.m. A builder sends 40 pages of plans. The bid is due Monday.
- That used to mean your weekend.
- Now, AI reads the plans.
- Every wall. Every opening. Every header.
- It counts the studs, plates, sheathing and blocking, and prices them at your rates.
- Anything unclear, it flags for you.
- You check. You approve. The bid goes out the same day.
- Week three. The site super wants a wall moved.
- Your foreman sends a voice note, in their own language.
- AI writes the change order, with photos and your price.
- The builder signs before the work starts.
- Draw two. AI builds a proper invoice, the way Alberta's prompt payment rules require.
- The 28-day clock starts on time. Holdback and lien dates are tracked.
- Same crews. More bids out. Every extra billed. Paid faster.
- Alpha Seed. AI for the paperwork behind every wall. Built in Calgary. Book a demo at alphaseed.ca.
A dramatized example. The framing company, the builder, the house and every number are invented, and the drawing is an illustration, not an engineered design. The same job is in the sample job pack, file by file. The times are from the example, not measurements from a client. Drawn in code, no stock footage; the voice is AI-generated.
What changes on a job
Alpha Seed builds a framing AI system for wood-frame contractors in Calgary and across Alberta. It reads the builder's PDF plans and does the takeoff wall by wall, prices the bid at your rates for your estimator to approve, turns a foreman's voice note into a change order the builder signs before the work, and puts a proper invoice out on every draw, with the 14- and 28-day dates, the holdback and the lien deadline tracked. Every file from the example job is free to download below.
- Bid
- Same dayPlans in at 4:12 PM, bid out at 6:40 PM in the sample job. A takeoff by hand usually takes 8 to 16 hours.
- Extras
- Signed before the workVoice note at 7:31 AM, change order signed at 7:52 AM. No more billing an extra months later and arguing about it.
- Getting paid
- Day 28, on the calendarEvery draw goes out as a proper invoice, so Alberta's 28-day payment clock starts when the builder receives it.
Times are from the sample job in the film and in the job pack below. Your numbers depend on your plans and your builders, so we measure them with you during the pilot. Sources are at the bottom of the page.
Book a 20-minute demo
Tell us what you frame. A person replies within one business day to set a time. Bring a plan set you've already bid and see the AI's takeoff next to your own number.
Where framing money leaks
Not on the deck. In the office, between the plans and the payment.
-
Bids done at midnight
A hand takeoff of one plan set takes 8 to 16 hours, according to Handoff, which sells takeoff software. It usually happens at night or on a weekend, and the small things counted from memory (blocking, fasteners, waste) come out of your margin. With fewer housing starts in Calgary this year, the framer who bids first and bids right gets the work.
-
Extras nobody signed
The super asks, your crew does it, and the bill goes in months later and gets argued. Approvals given on site by word of mouth are common, and they don't always hold up when a builder disputes the bill.
-
Invoices that don't start the clock
In Alberta an owner has 28 days to pay from a proper invoice, and a proper invoice has eight required items. Miss one and you're chasing instead of counting days. The holdback and the 60-day lien deadline need watching too.
-
Paper on every site, every day
Hazard assessments, a written fall protection plan wherever a worker can fall 3 metres or more without guardrails, training records, and all of it understood by a crew that may speak another language.
None of it is framing. It's reading, counting, typing and remembering dates. That's the part the AI takes.
How the framing AI system works
Six steps, in the same order as the film. At every step a person decides what goes out, and every step has a sample file you can open.
-
01 Plans in
The builder's PDF set, read the minute it arrives
AI Logs the invitation to bid, saves the plan set, reads every sheet (floor plans, elevations, sections, schedules, the header and beam schedule) and puts the due date on the calendar.
Your people Nothing yet. Your estimator gets a heads-up that a bid is in.
-
02 Takeoff
Every wall measured, every opening counted
AI Measures each wall and counts commons, kings, jacks, cripples, corners and backers, then plates, headers, sheathing and blocking with your waste factors. Whatever it can't read with confidence gets a cloud and a question instead of a guess.
Your people Your estimator checks the flags and the totals.
See the sample: the AI takeoff markup (PDF) and the workbook (Excel)
-
03 Bid
Priced at your rates, out the same day
AI Builds the bid from your rate card: line items, inclusions, exclusions, the flags as clarifications, draws and payment terms, in your format.
Your people Your estimator approves. Nothing is sent without that approval.
-
04 Extras
A voice note becomes a signed change order
AI Takes the foreman's voice note or text in any language, writes the change order in English with sketches, hours and material at your rates, and sends it to the builder for an e-signature.
Your people Your foreman confirms the transcript and the office approves the price. The crew starts once it's signed.
-
05 Invoice
A proper invoice on every draw
AI Puts the draw out with all eight items Alberta requires, adds the signed change orders, takes off the holdback, adds the GST, and checks the list before it goes.
Your people Your office approves and sends.
-
06 Paid
Every date watched until the money's in
AI Tracks the 14-day dispute window and the 28-day payment date on each invoice, the holdback on each draw and the 60-day lien deadline from the last day of work, and tells you before a date passes.
Your people You decide when to call, give notice or bring in your lawyer.
Download the sample job pack
Every file from the film's job, so you can check the AI's work yourself: the builder's plans, the takeoff the AI gives back, the bid, a change order, a proper invoice and the payment tracker. The numbers agree from file to file because they all come from the same drawings.
-
-
-
2 · The numbers
The takeoff workbook
Walls, openings, sheathing, blocking and pricing with live formulas: change a waste factor and the totals follow. 1,184 studs, 2,960 LF of plates, 46 headers, 212 sheets, 640 LF of blocking.
-
-
-
-
6 · Until it's paid
The payment tracker
The 14-day dispute window and the 28-day due date for each invoice, the holdback ledger and the 60-day lien deadline, in formulas you can reuse.
A fictional job: the companies, people, addresses, the house and every number are invented. The drawings aren't engineered and aren't for construction, and the rates are the sample company's own, not market rates. Nothing here is legal or tax advice.
Inside the job pack
Four pages from the sample files. Open one full size, or download the files above.
From the sample job. Every name and number is invented; the drawings are illustrations, not engineered designs.
Bring a plan set you've already bid
In 20 minutes we run the takeoff on it and you compare it with your own number. Then we tell you which step we'd set up first.
What stays with your people
The AI does the paperwork. The decisions with your name on them stay where they are.
- Prices
- Your rate card and your waste factors. The AI prices from them; it doesn't make up a number.
- What reaches a builder
- Every bid, change order and invoice waits for a person's approval. Nothing goes out on its own.
- Anything structural
- Header sizes, beams and posts come from the drawings, the suppliers and the engineer. The AI flags what's missing; it doesn't design it.
- The framing
- AI doesn't frame a wall or replace a good lead hand. It gives your foreman and your office their hours back.
- Your files
- Your plans, your prices and your job files remain yours.
Built for Alberta's rules
What the system tracks on every job. Your contracts and your lawyer decide anything beyond it.
| Code or rule | What it covers |
|---|---|
| Prompt Payment and Construction Lien Act: proper invoice | Eight required items, from the contractor's name and business address to a statement that the invoice is intended to be a proper invoice. |
| Payment timelines | The owner pays within 28 calendar days of receiving a proper invoice; a dispute needs notice within 14 calendar days; contractors pay subcontractors within 7 days of being paid. |
| Holdback | 10% of each payment, retained and released as the Act and the contract require. |
| Lien deadline | 60 days from the last day of work or materials. |
| OHS Code, Part 9 | Fall protection wherever a worker can fall 3 metres or more, and a written fall protection plan when workers aren't protected by guardrails. |
| National Building Code – 2023 Alberta Edition | Part 9 wood framing, in force in Alberta since May 1, 2024. The drawings and the City's inspections govern each job; framing is inspected before anything covers it. |
Who it's for
A good fit
- Framing companies in Calgary and across Alberta, from about 10 to 60 framers
- Production homes, townhouses and rowhouses, wood-frame multi-family, custom homes, garages and suites
- Labour-only or supply and install
- Bidding several plan sets a month from builders' PDFs, with the owner or one estimator doing the takeoffs
Tell us first if
- Your work is mostly steel or concrete. This system is built around wood framing.
- You need structural design. It reads the drawings and flags gaps; the designer and the engineer still decide sizes.
- You only work on renovations without drawings. We’ll say on the call what fits and what doesn’t.
How we start
-
A 20-minute demo
Bring one plan set you've already bid. We run the takeoff on it and you compare it with your own number.
-
One step, on your own jobs
Usually the takeoff and the bid first, set up on your rate card and your waste factors, and tested on past bids before it touches a live one.
-
A 90-day paid pilot
One fixed monthly price in writing, then month to month with 30 days’ notice. In Canadian dollars, GST extra. How pricing works.
Questions framers ask
Does the AI replace my estimator?
No. It does the reading, measuring and typing. Your estimator owns the rate card and the waste factors, checks every flag and approves every bid. Nothing goes out without a person’s approval.
How accurate is the AI takeoff?
It counts what’s on the plans with your rules, and flags what isn’t clear instead of guessing. In the pilot we test it on jobs you’ve already bid, against your own numbers, before it touches a live bid. The sample workbook shows every rule and every count.
Labour-only or supply and install?
Both. On labour-only jobs the takeoff checks the builder’s lumber package; on supply jobs it builds your material list and tracks how long each lumber quote holds.
Do my crews need a new app?
No. Foremen send voice notes, texts and photos the way they do now, in their own language. The AI writes the change order in English and the foreman confirms the transcript.
Is the proper invoice legal advice?
No. The system puts the required items on every invoice and tracks the dates. Disputes and liens go to your lawyer or an adjudicator.
What does it cost?
It depends on your volume and which steps you want. After the 20-minute demo we send one fixed monthly price in writing for a 90-day paid pilot, then month to month with 30 days’ notice. In Canadian dollars, GST extra. How pricing works.
Is the sample a real job?
No. The companies, the house and every number are invented, and the drawings aren’t engineered. It’s built so the files agree with each other, the way a real job’s files should.
Can we talk in Vietnamese?
Yes. We work in English and Vietnamese.
Book a 20-minute demo
Tell us what you frame. A person replies within one business day to set a time, and after the call you get a written quote.
- You tell us how a job moves today, from the invitation to bid to the last draw.
- We run the takeoff on a plan set you’ve already bid and you compare it with your number.
- We say what we’d set up first, and what isn’t worth paying for yet.
- You get a written quote: one fixed monthly price for the scope we agreed.
407 9 Ave SE
Calgary, AB T2G 2K7
support@alphaseed.ca
Weekdays, 9 to 5, Calgary time
We're in Calgary, on Mountain Time. Weekdays, 9 to 5, Calgary time. We reply within one business day.
Sources
Every figure on this page, where it comes from and when we read it.
- Proper invoice items and payment timelines: Government of Alberta, Prompt payment rules for the construction industry. Read November 21, 2026.
- Holdback: McCarthy Tétrault, Alberta lien fund and holdback system explained, August 19, 2024. Lien deadline: MLT Aikins, the Builders’ Lien Act becomes the PPCLA, and Procore, Builders’ Liens SOP. Read November 21, 2026.
- GST on holdbacks (Excise Tax Act s. 168(7)) and the invoice layout: a CRA interpretation on construction holdbacks. Read November 21, 2026.
- Fall protection: Government of Alberta, OHS Code, Part 9 and Fall protection plan (GS010). Read November 21, 2026.
- Takeoff time: Handoff, A contractor’s guide to AI takeoffs (8 to 16 hours by hand; a software vendor’s figure). Read November 20, 2026.
- Change orders: Levelset, subcontractor change orders; Construction Dive, keeping change orders from becoming disputes. Read November 20, 2026.
- Calgary housing starts in 2026: ATB Financial, Housing starts in October 2026. Read November 20, 2026.
- Codes and inspections: Government of Alberta, Building codes and standards; City of Calgary, contractor inspections. Read November 20, 2026.
- The times in the film and in the sample job pack are Alpha Seed’s illustration of one example job, not measurements from a client.