For framing contractors in Calgary and Alberta

The framing AI system: from the plans to getting paid.

It reads the builder's plans and does the takeoff wall by wall, prices the bid at your rates, turns every extra into a signed change order, and bills every draw the way Alberta's prompt payment rules require.

Built in Calgary. The AI does the paperwork; your prices, your approvals and the framing stay with your people.

Read the script
  1. Picture a framing contractor in Calgary.
  2. Friday, 4 p.m. A builder sends 40 pages of plans. The bid is due Monday.
  3. That used to mean your weekend.
  4. Now, AI reads the plans.
  5. Every wall. Every opening. Every header.
  6. It counts the studs, plates, sheathing and blocking, and prices them at your rates.
  7. Anything unclear, it flags for you.
  8. You check. You approve. The bid goes out the same day.
  9. Week three. The site super wants a wall moved.
  10. Your foreman sends a voice note, in their own language.
  11. AI writes the change order, with photos and your price.
  12. The builder signs before the work starts.
  13. Draw two. AI builds a proper invoice, the way Alberta's prompt payment rules require.
  14. The 28-day clock starts on time. Holdback and lien dates are tracked.
  15. Same crews. More bids out. Every extra billed. Paid faster.
  16. Alpha Seed. AI for the paperwork behind every wall. Built in Calgary. Book a demo at alphaseed.ca.

A dramatized example. The framing company, the builder, the house and every number are invented, and the drawing is an illustration, not an engineered design. The same job is in the sample job pack, file by file. The times are from the example, not measurements from a client. Drawn in code, no stock footage; the voice is AI-generated.

What changes on a job

Alpha Seed builds a framing AI system for wood-frame contractors in Calgary and across Alberta. It reads the builder's PDF plans and does the takeoff wall by wall, prices the bid at your rates for your estimator to approve, turns a foreman's voice note into a change order the builder signs before the work, and puts a proper invoice out on every draw, with the 14- and 28-day dates, the holdback and the lien deadline tracked. Every file from the example job is free to download below.

Bid
Same dayPlans in at 4:12 PM, bid out at 6:40 PM in the sample job. A takeoff by hand usually takes 8 to 16 hours.
Extras
Signed before the workVoice note at 7:31 AM, change order signed at 7:52 AM. No more billing an extra months later and arguing about it.
Getting paid
Day 28, on the calendarEvery draw goes out as a proper invoice, so Alberta's 28-day payment clock starts when the builder receives it.

Times are from the sample job in the film and in the job pack below. Your numbers depend on your plans and your builders, so we measure them with you during the pilot. Sources are at the bottom of the page.

Book a 20-minute demo

Tell us what you frame. A person replies within one business day to set a time. Bring a plan set you've already bid and see the AI's takeoff next to your own number.

We reply within one business day.

Where framing money leaks

Not on the deck. In the office, between the plans and the payment.

  1. Bids done at midnight

    A hand takeoff of one plan set takes 8 to 16 hours, according to Handoff, which sells takeoff software. It usually happens at night or on a weekend, and the small things counted from memory (blocking, fasteners, waste) come out of your margin. With fewer housing starts in Calgary this year, the framer who bids first and bids right gets the work.

  2. Extras nobody signed

    The super asks, your crew does it, and the bill goes in months later and gets argued. Approvals given on site by word of mouth are common, and they don't always hold up when a builder disputes the bill.

  3. Invoices that don't start the clock

    In Alberta an owner has 28 days to pay from a proper invoice, and a proper invoice has eight required items. Miss one and you're chasing instead of counting days. The holdback and the 60-day lien deadline need watching too.

  4. Paper on every site, every day

    Hazard assessments, a written fall protection plan wherever a worker can fall 3 metres or more without guardrails, training records, and all of it understood by a crew that may speak another language.

None of it is framing. It's reading, counting, typing and remembering dates. That's the part the AI takes.

How the framing AI system works

Six steps, in the same order as the film. At every step a person decides what goes out, and every step has a sample file you can open.

  1. 01 Plans in

    The builder's PDF set, read the minute it arrives

    AI Logs the invitation to bid, saves the plan set, reads every sheet (floor plans, elevations, sections, schedules, the header and beam schedule) and puts the due date on the calendar.

    Your people Nothing yet. Your estimator gets a heads-up that a bid is in.

    See the sample: the plan set (8 sheets, PDF)

  2. 02 Takeoff

    Every wall measured, every opening counted

    AI Measures each wall and counts commons, kings, jacks, cripples, corners and backers, then plates, headers, sheathing and blocking with your waste factors. Whatever it can't read with confidence gets a cloud and a question instead of a guess.

    Your people Your estimator checks the flags and the totals.

    See the sample: the AI takeoff markup (PDF) and the workbook (Excel)

  3. 03 Bid

    Priced at your rates, out the same day

    AI Builds the bid from your rate card: line items, inclusions, exclusions, the flags as clarifications, draws and payment terms, in your format.

    Your people Your estimator approves. Nothing is sent without that approval.

    See the sample: bid Q-0219 (PDF)

  4. 04 Extras

    A voice note becomes a signed change order

    AI Takes the foreman's voice note or text in any language, writes the change order in English with sketches, hours and material at your rates, and sends it to the builder for an e-signature.

    Your people Your foreman confirms the transcript and the office approves the price. The crew starts once it's signed.

    See the sample: change order CO-07 (PDF)

  5. 05 Invoice

    A proper invoice on every draw

    AI Puts the draw out with all eight items Alberta requires, adds the signed change orders, takes off the holdback, adds the GST, and checks the list before it goes.

    Your people Your office approves and sends.

    See the sample: proper invoice INV-1042 (PDF)

  6. 06 Paid

    Every date watched until the money's in

    AI Tracks the 14-day dispute window and the 28-day payment date on each invoice, the holdback on each draw and the 60-day lien deadline from the last day of work, and tells you before a date passes.

    Your people You decide when to call, give notice or bring in your lawyer.

    See the sample: the payment tracker (Excel)

Download the sample job pack

Every file from the film's job, so you can check the AI's work yourself: the builder's plans, the takeoff the AI gives back, the bid, a change order, a proper invoice and the payment tracker. The numbers agree from file to file because they all come from the same drawings.

Download the whole pack (ZIP)

ZIP · 559 KB · 8 files and a README · free, no email needed

  1. Cover sheet of the sample plan set with the front elevation, drawing list, general notes and site plan

    1 · What the AI reads

    The plan set

    Eight 11x17 sheets for a two-storey house with a basement suite and a detached garage: cover, three floor plans, elevations, section, garage and schedules, framing plans with the header schedule.

    PDF · 164 KB · 8 sheets

  2. Summary page of the AI takeoff with the totals, two flags for the estimator and the Friday timeline

    2 · What the AI gives back

    The AI takeoff markup

    The same sheets with every wall colour-coded, tagged and measured, every opening ticked with its header, and two flags clouded: a header with no size and a roof pitch that doesn't match between sheets.

    PDF · 165 KB · 6 pages

  3. The takeoff workbook's summary sheet with waste factors and the totals

    2 · The numbers

    The takeoff workbook

    Walls, openings, sheathing, blocking and pricing with live formulas: change a waste factor and the totals follow. 1,184 studs, 2,960 LF of plates, 46 headers, 212 sheets, 640 LF of blocking.

    Excel · 27 KB · 7 sheets

  4. First page of bid Q-0219 with the price table and the takeoff totals

    3 · Out the same day

    Bid Q-0219

    Labour only, $38,400 plus GST, priced at the company's rate card, with the takeoff, the two flags as clarifications, inclusions, exclusions, draws and payment terms.

    PDF · 64 KB · 2 pages

  5. Change order CO-07 with the voice-note transcript, the scope, two sketches, the price and the signature

    4 · Week 3

    Change order CO-07

    A foreman's 14-second voice note in Vietnamese, turned into an English change order with two sketches, 6 crew-hours and $180 of material. Signed by the builder at 7:52 AM, before the work.

    PDF · 103 KB · 1 page

  6. Proper invoice INV-1042 with the work billed, holdback, GST, payment terms and the eight-item checklist

    5 · Draw 2

    Proper invoice INV-1042

    Draw 2 plus CO-07, less the 10% holdback, plus GST on the rest, with the eight items Alberta's Prompt Payment and Construction Lien Act requires, numbered and checked.

    PDF · 83 KB · 1 page

  7. The payment tracker with three invoices, their dispute and due dates and their status

    6 · Until it's paid

    The payment tracker

    The 14-day dispute window and the 28-day due date for each invoice, the holdback ledger and the 60-day lien deadline, in formulas you can reuse.

    Excel · 14 KB · 5 sheets

A fictional job: the companies, people, addresses, the house and every number are invented. The drawings aren't engineered and aren't for construction, and the rates are the sample company's own, not market rates. Nothing here is legal or tax advice.

Inside the job pack

Four pages from the sample files. Open one full size, or download the files above.

Main floor plan of the sample house: walls, doors with their swings, window and door marks, header marks beside the bearing openings, the stair, the kitchen and the grid lines
The plans it reads. The builder's main floor plan: walls, door and window marks, a header mark beside every bearing opening, grids and dimensions.
The main floor plan under the AI's markup: exterior walls in green, partitions in blue, each tagged with its length, openings ticked, and a red cloud at window W2
The takeoff it gives back. Every wall colour-coded and tagged with its length, every opening ticked, and a cloud where something doesn't add up.
Change order CO-07: the foreman's voice note in Vietnamese and in English, the scope, and sketches of the moved wall and the cabinet blocking
The extra, signed. The voice note in Vietnamese, the scope in English, two sketches. The builder signed at 7:52 AM, before the crew started.
The bottom of invoice INV-1042: payment terms, the proper invoice statement and the eight required items, each ticked
The invoice that starts the clock. The statement Alberta asks for, and the eight required items checked off before the invoice goes.

From the sample job. Every name and number is invented; the drawings are illustrations, not engineered designs.

Bring a plan set you've already bid

In 20 minutes we run the takeoff on it and you compare it with your own number. Then we tell you which step we'd set up first.

What stays with your people

The AI does the paperwork. The decisions with your name on them stay where they are.

Prices
Your rate card and your waste factors. The AI prices from them; it doesn't make up a number.
What reaches a builder
Every bid, change order and invoice waits for a person's approval. Nothing goes out on its own.
Anything structural
Header sizes, beams and posts come from the drawings, the suppliers and the engineer. The AI flags what's missing; it doesn't design it.
The framing
AI doesn't frame a wall or replace a good lead hand. It gives your foreman and your office their hours back.
Your files
Your plans, your prices and your job files remain yours.

Built for Alberta's rules

What the system tracks on every job. Your contracts and your lawyer decide anything beyond it.

Code or ruleWhat it covers
Prompt Payment and Construction Lien Act: proper invoiceEight required items, from the contractor's name and business address to a statement that the invoice is intended to be a proper invoice.
Payment timelinesThe owner pays within 28 calendar days of receiving a proper invoice; a dispute needs notice within 14 calendar days; contractors pay subcontractors within 7 days of being paid.
Holdback10% of each payment, retained and released as the Act and the contract require.
Lien deadline60 days from the last day of work or materials.
OHS Code, Part 9Fall protection wherever a worker can fall 3 metres or more, and a written fall protection plan when workers aren't protected by guardrails.
National Building Code – 2023 Alberta EditionPart 9 wood framing, in force in Alberta since May 1, 2024. The drawings and the City's inspections govern each job; framing is inspected before anything covers it.

Who it's for

A good fit

  • Framing companies in Calgary and across Alberta, from about 10 to 60 framers
  • Production homes, townhouses and rowhouses, wood-frame multi-family, custom homes, garages and suites
  • Labour-only or supply and install
  • Bidding several plan sets a month from builders' PDFs, with the owner or one estimator doing the takeoffs

Tell us first if

  • Your work is mostly steel or concrete. This system is built around wood framing.
  • You need structural design. It reads the drawings and flags gaps; the designer and the engineer still decide sizes.
  • You only work on renovations without drawings. We’ll say on the call what fits and what doesn’t.

How we start

  1. A 20-minute demo

    Bring one plan set you've already bid. We run the takeoff on it and you compare it with your own number.

  2. One step, on your own jobs

    Usually the takeoff and the bid first, set up on your rate card and your waste factors, and tested on past bids before it touches a live one.

  3. A 90-day paid pilot

    One fixed monthly price in writing, then month to month with 30 days’ notice. In Canadian dollars, GST extra. How pricing works.

Questions framers ask

Does the AI replace my estimator?

No. It does the reading, measuring and typing. Your estimator owns the rate card and the waste factors, checks every flag and approves every bid. Nothing goes out without a person’s approval.

How accurate is the AI takeoff?

It counts what’s on the plans with your rules, and flags what isn’t clear instead of guessing. In the pilot we test it on jobs you’ve already bid, against your own numbers, before it touches a live bid. The sample workbook shows every rule and every count.

Labour-only or supply and install?

Both. On labour-only jobs the takeoff checks the builder’s lumber package; on supply jobs it builds your material list and tracks how long each lumber quote holds.

Do my crews need a new app?

No. Foremen send voice notes, texts and photos the way they do now, in their own language. The AI writes the change order in English and the foreman confirms the transcript.

Is the proper invoice legal advice?

No. The system puts the required items on every invoice and tracks the dates. Disputes and liens go to your lawyer or an adjudicator.

What does it cost?

It depends on your volume and which steps you want. After the 20-minute demo we send one fixed monthly price in writing for a 90-day paid pilot, then month to month with 30 days’ notice. In Canadian dollars, GST extra. How pricing works.

Is the sample a real job?

No. The companies, the house and every number are invented, and the drawings aren’t engineered. It’s built so the files agree with each other, the way a real job’s files should.

Can we talk in Vietnamese?

Yes. We work in English and Vietnamese.

Book a 20-minute demo

Tell us what you frame. A person replies within one business day to set a time, and after the call you get a written quote.

  1. You tell us how a job moves today, from the invitation to bid to the last draw.
  2. We run the takeoff on a plan set you’ve already bid and you compare it with your number.
  3. We say what we’d set up first, and what isn’t worth paying for yet.
  4. You get a written quote: one fixed monthly price for the scope we agreed.
Alpha Seed Inc.
407 9 Ave SE
Calgary, AB T2G 2K7
support@alphaseed.ca
Weekdays, 9 to 5, Calgary time

We're in Calgary, on Mountain Time. Weekdays, 9 to 5, Calgary time. We reply within one business day.

We reply within one business day.