For electrical contractors in Calgary and Alberta

The electrical AI system: from the bid to “Acceptable.”

It counts the devices and drafts the estimate, the load calculation, the panel schedules and the single-line diagram, checks your site photos before the inspection, and turns a voice note into a priced change order. Your Master Electrician checks and signs.

Built in Calgary. Further down: a complete sample job, free to download, so you can judge the work before you talk to us.

Read the script
  1. In Calgary, 1 in 7 electrical inspections comes back “not acceptable.”
  2. Your crew knows the work. It's the paperwork that slows you down.
  3. Alpha Seed gives you an AI back office. It does the heavy lifting. Your people approve.
  4. A bid comes in. AI counts every device, measures every run, and drafts the estimate. Your estimator checks it. It goes out the same day.
  5. Then the design: load calculation, panel schedules, single-line diagram. Your Master Electrician reviews it… and signs.
  6. Before the inspector arrives, a photo check catches what's missing.
  7. A change on site? A photo and a voice note become a priced change order, and an invoice, the same day.
  8. Same crew. More jobs. Fewer return trips.
  9. Alpha Seed. AI for the complex work in construction. Built in Calgary.

A dramatized example. The contractor, the people, the job and every number on the sheet are invented, and the drawing is an illustration, not a design. The sample files below are a fuller job of the same kind, also fictional. The 1-in-7 figure is our count from the City of Calgary’s open data (sources); it contains information licensed under the Open Government Licence – City of Calgary. The stamp is a prop, not a City document. Drawn in code, no stock footage; the voice is AI-generated.

What changes on a job

Alpha Seed builds an electrical AI system for contractors in Calgary and across Alberta. It does the takeoff and drafts the estimate from your price book, works out the load calculation, panel schedules and single-line diagram with the fault current at every panel and disconnect, checks your site photos before you book the inspection, and turns a photo and a voice note into a priced change order and a proper invoice. Your estimator, your Master Electrician and your project manager approve every step. Below is a complete sample job to download: seven drawing sheets, the estimate, the panel schedules, the load calculation, a change order, a progress invoice and a pre-inspection checklist.

Bid
Same dayThe takeoff and the estimate are ready for your estimator the day the bid set arrives. Vendors report AI device counts about 60 % faster than by hand.
Change orders
22 days → same dayA US survey puts 22 days between a signed T&M tag and a priced change order. Here a photo and a voice note become one before the work starts.
Inspections
Photo-checked first1 in 7 electrical inspections in Calgary came back Not Acceptable over the past year. The AI checks your site photos against a checklist before you book.

Estimates for a small commercial job like the sample below. Your numbers depend on your jobs, so we measure them with you during the pilot. Sources are at the bottom of the page.

Book a 20-minute demo

Tell us what kind of electrical work you do. A person replies within one business day to set a time.

We reply within one business day.

Download the sample job

One fictional job, start to finish, drafted by our AI in the format we'd set up for you: a 1,080 m² office, showroom and warehouse fit-out in Calgary with a new 600 A service. Every file comes from the same model of the job, so the drawings, the estimate, the change order and the invoice agree with each other.

7 sheets · ARCH D (36 × 24 in) · PDF

The drawing set

Cover sheet and legend, lighting and power plans, the single-line diagram with fault current, panel schedules, the load calculation and details. On a real job it carries your title block and your Master Electrician's review.

  1. Sheet E-001, cover sheet, legend and general notes, from the sample electrical drawing set E-001 Cover sheet, legend and general notes Drawing list, project data, symbols, abbreviations, general notes, the scope of work and the codes that apply. PDF · 93 KB
  2. Sheet E-101, lighting plan, from the sample electrical drawing set E-101 Lighting plan Every fixture, switch and sensor, circuited to Panel B, with the fixture schedule and the controls. PDF · 101 KB
  3. Sheet E-102, power and systems plan, from the sample electrical drawing set E-102 Power and systems plan Receptacles, equipment connections, EV chargers, the roof plan, and change order CO-07 clouded as revision 1. PDF · 108 KB
  4. Sheet E-201, single-line diagram and fault current, from the sample electrical drawing set E-201 Single-line diagram and fault current From the ENMAX transformer to every panel and disconnect, with the fault current at each and the PL 1219 items. PDF · 98 KB
  5. Sheet E-301, panel schedules, from the sample electrical drawing set E-301 Panel schedules MSB, Panel A and Panel B, phases balanced and checked at 80 %, and what two more EV chargers would do. PDF · 102 KB
  6. Sheet E-302, load calculation and voltage drop, from the sample electrical drawing set E-302 Load calculation and voltage drop CEC Rule 8-210 for the service, both feeders, voltage drop on the longest runs, and the assumptions to confirm. PDF · 89 KB
  7. Sheet E-501, details, from the sample electrical drawing set E-501 Details Service bonding, EV charger mounting, rooftop unit connection, mounting heights, labels, the underground trench. PDF · 89 KB
  8. ZIP · 1.6 MB Everything, in one ZIP The full set and each sheet, the estimate in PDF, Excel and CSV, the change order, the invoice, the photo check and both workbooks, with a read-me. Download everything

The paperwork around it

Change order CO-07

Two receptacles asked for on site at 2:12 PM. A photo and the foreman's 7-second voice note, in Vietnamese, became this priced change order, signed by the owner's representative at 2:31 PM.

Progress invoice INV-1182

October's draw against the schedule of values, with CO-07, 10 % holdback and GST, written as a proper invoice under Alberta's prompt payment law. Page 2 is the AI's sending check and the dates it tracks.

Pre-inspection photo check PC-03

Twenty checks against 46 site photos before booking the rough-in and service inspection. One fix found and made: the main bonding jumper in the switchboard.

Panel schedule workbook

Panel A, Panel B and the MSB as editable sheets. Enter each breaker's position, poles and load; the phase totals, the 80 % checks and the fault-current check update.

Load calculation workbook

The Rule 8-210 service calculation, feeders, voltage drop and point-to-point fault current as formulas you can reuse, with the table values it looks up laid out for you to check.

A fictional job: the building, the owner, the contractor, the quantities and the prices are invented. Nothing has been reviewed, signed or sealed, and nothing is for construction. Free to use as a reference or a template, without warranty. Check every value against the CEC 2024, Alberta's STANDATA and the City of Calgary's requirements for your own job.

Where electrical jobs stall

Not in the ceiling. In the office, between the bid invite and the final invoice.

  1. Bids eat the estimator's week

    Counting devices and measuring runs across a sixty-sheet PDF set, then pricing it, mostly for jobs you won't win: hard bids are often won one time in five to ten, according to ConstructConnect.

  2. The design pack waits for one person

    On a 600 A service the City of Calgary asks for a single-line diagram, shop drawings and the short-circuit current at the service and at every downstream panel and disconnect. The load calculation and the panel schedules land on the same desk: the Master Electrician's, who is also the only one who can take out the permit.

  3. Inspections come back

    From November 2025 to November 2026, 1 in 7 electrical inspections in Calgary came back Not Acceptable, by our count of the City's open data. Each one is a return trip, a fix and a new booking.

  4. Extras get billed late, or never

    A US survey of subcontractors found 22 days between a signed T&M tag and a priced change order, and most had written some off. In Alberta the 28-day payment clock only starts with a proper invoice.

None of it is hard for your people. It's slow because it's counting, typing, checking and chasing. That's the part the AI takes.

How the electrical AI system works

Six steps, in the same order as the film and the sample files. At every step a person decides what goes out.

  1. 01 Bid

    Takeoff and estimate from the bid set

    AI Reads the drawings, addenda and specs, counts every device, measures every run along its route, applies your labour units and prices from your price book. The quotation and the internal build-up come out in your format, like estimate E-0247. Anything unclear goes on a list of questions instead of being guessed.

    Your people Your estimator checks scope, exclusions and price, and sends it.

  2. 02 Design

    Load calculation, panel schedules, single-line diagram

    AI Calculates the service and the feeders to CEC Rule 8-210, builds and balances the panel schedules, draws the single-line diagram and works out the fault current at every panel and disconnect, the way the City's PL 1219 checklist asks for a 600 A service (sheets E-201, E-301, E-302).

    Your people Your Master Electrician, and your engineer where one is required, reviews it and decides.

  3. 03 Drawings

    Plans and details in your title block

    AI Lays out the lighting, power and equipment connections, circuits them, and fills in the schedules, keyed notes, legend and details, keeping every sheet consistent with the calculations (E-001 to E-501).

    Your people Your designer or lead hand adjusts whatever needs a human eye.

  4. 04 Review

    Markups in, revisions out

    AI Takes the markup the way it's given today, makes each change, clouds it, and updates every sheet and schedule the change touches.

    Your people Your Master Electrician signs off. The AI never signs, and never applies for a permit.

  5. 05 Inspection

    A photo check before you book

    AI Checks the foreman's site photos against a checklist built from the drawings and the code: bonding, labels, working space, ratings, GFCI protection, firestopping. It lists what's missing (checklist PC-03).

    Your people Your crew fixes it, and your Master Electrician books the inspection.

  6. 06 Billing

    Change orders and invoices the same day

    AI Turns a site photo and a voice note, in your crew's language, into a priced change order for the client to sign before the work (CO-07), bills it on the next proper invoice, and tracks the 14- and 28-day dates and the holdback (INV-1182).

    Your people Your project manager approves what goes out.

Inside the drawing set

What the AI puts on the sheets before your Master Electrician sees them. Each picture opens its sheet as a PDF.

Single-line diagram: the ENMAX pad-mount transformer, the underground service, the CT cabinet and meter, and the 600 A main switchboard with its main bonding jumper and feeder breakers.
Fault current from the service down. The utility's 22 kA at the service, then every panel and disconnect downstream, the way the City asks for it on a 600 A service.
Panel A schedule: rooftop units, make-up air unit, EV chargers and the water heater, each load split across phases A, B and C.
Every circuit, balanced. Each breaker's load split onto its phases and checked against 80 % of the bus, with room left for the next EV charger, or a warning that there isn't.
Service load calculation table under CEC Rule 8-210, with the result 147,497 W, or 409.4 A on a 600 A service, and the feeder calculations below.
The load calculation, shown line by line. Table 14 basic load at 70 %, motors and chargers at 100 %, electric heat at 75 %: 147.5 kVA, or 409 A on a 600 A service, with every assumption listed.
Power plan around the offices, with a red revision cloud and delta 1 around two new receptacles in Office 110 on circuit B-37.
The change order, on the plan. CO-07 clouded as revision 1: two receptacles in Office 110 on new circuit B-37, carried into the panel schedule and onto the invoice.

From the sample job. The building and every value are invented; it's an illustration, not a design for construction.

Bring a job like yours to the demo

Tell us which part eats your office's week: bids, the design pack, inspections or billing. In 20 minutes we show you how the system would handle a job like yours, and which step we'd set up first.

What stays with your people

The AI does the legwork. The decisions that carry your name stay where they are.

Permits and signatures
In Alberta only a Master Electrician can take out an electrical permit for a contractor. Your Master Electrician, and your engineer where one is required, reviews and signs. The AI never signs, seals or applies for a permit.
Prices
Your estimator owns the price book and the labour units. The AI prices from them; it doesn't make up a number.
What reaches a client or the City
Every estimate, drawing, change order and invoice waits for a person's approval. Nothing goes out on its own.
Your files
Your price book, drawings, photos and job files remain yours.

Built for Alberta's rules

What the system starts from. Your Master Electrician confirms what applies to each job.

Code or ruleWhat it covers
Canadian Electrical Code, Part I, 2024 (CSA C22.1:24)In force in Alberta since April 1, 2025. Section 8 for loads and demand factors, Section 10 for grounding and bonding, Section 2 for marking and working space.
Alberta STANDATAThe province's interpretations and variances of the electrical code, checked for each job.
Master ElectricianOnly a Master Electrician can take out an electrical permit for a contractor in Alberta; a homeowner can for their own home.
City of Calgary electrical permits (PL 1219)A service of 600 A or more, or underground conductors of 1/0 and larger, needs a single-line diagram, shop drawings and the short-circuit current at the service and at every downstream panel and disconnect.
Prompt Payment and Construction Lien ActA proper invoice has eight required items. The owner pays within 28 days of receiving it or disputes it within 14; a contractor pays its subcontractors within 7 days of being paid.
NECB 2020 and NBC 2023 Alberta EditionLighting power and automatic lighting controls (NECB), emergency lighting and exit signs (NBC), both in force in Alberta since May 1, 2024.

Who it's for

A good fit

  • Electrical contractors in Calgary and across Alberta
  • Commercial and light industrial work: tenant fit-outs, services and distribution, EV charging, rooftop equipment
  • Shops bidding several jobs a week, where the estimator or the Master Electrician is the bottleneck
  • Residential electrical contractors moving into commercial work

Tell us first if

  • Your work is mostly large projects coordinated in BIM with the other trades. We’ll say on the call what fits and what doesn’t.
  • Your jobs need an engineer’s seal and you don’t work with one. The system drafts; a qualified person still reviews and signs.
  • You mostly need the phone answered. Our AI call answering covers missed calls and booking.

How we start

  1. A 20-minute demo

    Your job types, your tools and where the week goes. We say which step we'd set up first, and what we wouldn't.

  2. One step, on your own data

    Usually the takeoff and estimate first, set up on your price book and labour units, and tested on jobs you've already bid, against your own numbers, before it touches a live one.

  3. A 90-day paid pilot

    One fixed monthly price in writing, then month to month with 30 days’ notice. In Canadian dollars, GST extra. How pricing works.

Questions electrical contractors ask

Are the sample files free to use?

Yes. Use them as a reference or a template. The job is fictional, nothing in the files has been reviewed, signed or sealed, and they come without warranty, so check every value against the CEC 2024, STANDATA and the City of Calgary’s requirements for your own job.

Does the AI replace our estimator or our Master Electrician?

No. It does the counting, typing, drafting and chasing. Your estimator owns the price book and approves every bid. Your Master Electrician reviews and signs the design pack and is still the only one who can take out the permit. The AI never signs anything and never sends anything on its own.

Which code does it work to?

The Canadian Electrical Code, Part I, 2024 as adopted in Alberta (in force since April 1, 2025), Alberta’s STANDATA, and the City of Calgary’s permit requirements, including the PL 1219 checklist for services of 600 A or more. Your Master Electrician confirms what applies to each job.

Can it read our bid sets and site photos?

Yes. PDF drawings, addenda, specifications, scans and photos. Anything it can’t read clearly goes on a list of questions instead of being guessed.

Does it work with our estimating software?

We build around what you already use: your estimating software or spreadsheet, your price book and your title block. The sample takeoff also comes as a CSV, the simplest format to import or paste. In the demo we check what connects directly and what needs an export.

Does the photo check mean we'll pass the inspection?

No. It catches what’s visible in the photos and missing against the checklist, like the bonding jumper in the sample. The inspector decides, and your Master Electrician still walks the job.

What does it cost?

It depends on your job types, your volume and which steps you want. After the 20-minute demo we send one fixed monthly price in writing for a 90-day paid pilot, then month to month with 30 days’ notice. In Canadian dollars, GST extra. How pricing works.

Is the film a real customer?

No. It’s a dramatized example; the company, the people and the job are invented. The sample files are a fuller job of the same kind, also fictional. The sources for the figures are listed below.

Can we talk in Vietnamese?

Yes. We work in English and Vietnamese. The AI also reads voice notes in many languages, like the Vietnamese one behind the sample change order.

Book a 20-minute demo

Tell us about your electrical work. A person replies within one business day to set a time, and after the call you get a written quote.

  1. You tell us how a job moves today, from the bid invite to the final invoice.
  2. We walk through a job like yours: the takeoff, the design pack and the paperwork it would produce.
  3. We say what we’d set up first, and what isn’t worth paying for yet.
  4. You get a written quote: one fixed monthly price for the scope we agreed.
Alpha Seed Inc.
407 9 Ave SE
Calgary, AB T2G 2K7
support@alphaseed.ca
Weekdays, 9 to 5, Calgary time

We're in Calgary, on Mountain Time. Weekdays, 9 to 5, Calgary time. We reply within one business day.

We reply within one business day.

Sources

Every figure on this page, where it comes from and when we read it.