Estimate E-0247
The quotation the client sees, with the schedule of values, inclusions, exclusions and clarifications, then the internal build-up and the priced takeoff: 60 lines, 752 labour hours.
For electrical contractors in Calgary and Alberta
It counts the devices and drafts the estimate, the load calculation, the panel schedules and the single-line diagram, checks your site photos before the inspection, and turns a voice note into a priced change order. Your Master Electrician checks and signs.
Built in Calgary. Further down: a complete sample job, free to download, so you can judge the work before you talk to us.
Jump to a chapter, or download a complete sample job in the same format.
A dramatized example. The contractor, the people, the job and every number on the sheet are invented, and the drawing is an illustration, not a design. The sample files below are a fuller job of the same kind, also fictional. The 1-in-7 figure is our count from the City of Calgary’s open data (sources); it contains information licensed under the Open Government Licence – City of Calgary. The stamp is a prop, not a City document. Drawn in code, no stock footage; the voice is AI-generated.
Alpha Seed builds an electrical AI system for contractors in Calgary and across Alberta. It does the takeoff and drafts the estimate from your price book, works out the load calculation, panel schedules and single-line diagram with the fault current at every panel and disconnect, checks your site photos before you book the inspection, and turns a photo and a voice note into a priced change order and a proper invoice. Your estimator, your Master Electrician and your project manager approve every step. Below is a complete sample job to download: seven drawing sheets, the estimate, the panel schedules, the load calculation, a change order, a progress invoice and a pre-inspection checklist.
Estimates for a small commercial job like the sample below. Your numbers depend on your jobs, so we measure them with you during the pilot. Sources are at the bottom of the page.
Tell us what kind of electrical work you do. A person replies within one business day to set a time.
One fictional job, start to finish, drafted by our AI in the format we'd set up for you: a 1,080 m² office, showroom and warehouse fit-out in Calgary with a new 600 A service. Every file comes from the same model of the job, so the drawings, the estimate, the change order and the invoice agree with each other.
E-001
Cover sheet, legend and general notes
Drawing list, project data, symbols, abbreviations, general notes, the scope of work and the codes that apply.
E-101
Lighting plan
Every fixture, switch and sensor, circuited to Panel B, with the fixture schedule and the controls.
E-102
Power and systems plan
Receptacles, equipment connections, EV chargers, the roof plan, and change order CO-07 clouded as revision 1.
E-201
Single-line diagram and fault current
From the ENMAX transformer to every panel and disconnect, with the fault current at each and the PL 1219 items.
E-301
Panel schedules
MSB, Panel A and Panel B, phases balanced and checked at 80 %, and what two more EV chargers would do.
E-302
Load calculation and voltage drop
CEC Rule 8-210 for the service, both feeders, voltage drop on the longest runs, and the assumptions to confirm.
E-501
Details
Service bonding, EV charger mounting, rooftop unit connection, mounting heights, labels, the underground trench.
The quotation the client sees, with the schedule of values, inclusions, exclusions and clarifications, then the internal build-up and the priced takeoff: 60 lines, 752 labour hours.
Two receptacles asked for on site at 2:12 PM. A photo and the foreman's 7-second voice note, in Vietnamese, became this priced change order, signed by the owner's representative at 2:31 PM.
October's draw against the schedule of values, with CO-07, 10 % holdback and GST, written as a proper invoice under Alberta's prompt payment law. Page 2 is the AI's sending check and the dates it tracks.
Twenty checks against 46 site photos before booking the rough-in and service inspection. One fix found and made: the main bonding jumper in the switchboard.
Panel A, Panel B and the MSB as editable sheets. Enter each breaker's position, poles and load; the phase totals, the 80 % checks and the fault-current check update.
The Rule 8-210 service calculation, feeders, voltage drop and point-to-point fault current as formulas you can reuse, with the table values it looks up laid out for you to check.
A fictional job: the building, the owner, the contractor, the quantities and the prices are invented. Nothing has been reviewed, signed or sealed, and nothing is for construction. Free to use as a reference or a template, without warranty. Check every value against the CEC 2024, Alberta's STANDATA and the City of Calgary's requirements for your own job.
Not in the ceiling. In the office, between the bid invite and the final invoice.
Counting devices and measuring runs across a sixty-sheet PDF set, then pricing it, mostly for jobs you won't win: hard bids are often won one time in five to ten, according to ConstructConnect.
On a 600 A service the City of Calgary asks for a single-line diagram, shop drawings and the short-circuit current at the service and at every downstream panel and disconnect. The load calculation and the panel schedules land on the same desk: the Master Electrician's, who is also the only one who can take out the permit.
From November 2025 to November 2026, 1 in 7 electrical inspections in Calgary came back Not Acceptable, by our count of the City's open data. Each one is a return trip, a fix and a new booking.
A US survey of subcontractors found 22 days between a signed T&M tag and a priced change order, and most had written some off. In Alberta the 28-day payment clock only starts with a proper invoice.
None of it is hard for your people. It's slow because it's counting, typing, checking and chasing. That's the part the AI takes.
Six steps, in the same order as the film and the sample files. At every step a person decides what goes out.
01 Bid
AI Reads the drawings, addenda and specs, counts every device, measures every run along its route, applies your labour units and prices from your price book. The quotation and the internal build-up come out in your format, like estimate E-0247. Anything unclear goes on a list of questions instead of being guessed.
Your people Your estimator checks scope, exclusions and price, and sends it.
02 Design
AI Calculates the service and the feeders to CEC Rule 8-210, builds and balances the panel schedules, draws the single-line diagram and works out the fault current at every panel and disconnect, the way the City's PL 1219 checklist asks for a 600 A service (sheets E-201, E-301, E-302).
Your people Your Master Electrician, and your engineer where one is required, reviews it and decides.
03 Drawings
AI Lays out the lighting, power and equipment connections, circuits them, and fills in the schedules, keyed notes, legend and details, keeping every sheet consistent with the calculations (E-001 to E-501).
Your people Your designer or lead hand adjusts whatever needs a human eye.
04 Review
AI Takes the markup the way it's given today, makes each change, clouds it, and updates every sheet and schedule the change touches.
Your people Your Master Electrician signs off. The AI never signs, and never applies for a permit.
05 Inspection
AI Checks the foreman's site photos against a checklist built from the drawings and the code: bonding, labels, working space, ratings, GFCI protection, firestopping. It lists what's missing (checklist PC-03).
Your people Your crew fixes it, and your Master Electrician books the inspection.
06 Billing
AI Turns a site photo and a voice note, in your crew's language, into a priced change order for the client to sign before the work (CO-07), bills it on the next proper invoice, and tracks the 14- and 28-day dates and the holdback (INV-1182).
Your people Your project manager approves what goes out.
What the AI puts on the sheets before your Master Electrician sees them. Each picture opens its sheet as a PDF.
From the sample job. The building and every value are invented; it's an illustration, not a design for construction.
Tell us which part eats your office's week: bids, the design pack, inspections or billing. In 20 minutes we show you how the system would handle a job like yours, and which step we'd set up first.
The AI does the legwork. The decisions that carry your name stay where they are.
What the system starts from. Your Master Electrician confirms what applies to each job.
| Code or rule | What it covers |
|---|---|
| Canadian Electrical Code, Part I, 2024 (CSA C22.1:24) | In force in Alberta since April 1, 2025. Section 8 for loads and demand factors, Section 10 for grounding and bonding, Section 2 for marking and working space. |
| Alberta STANDATA | The province's interpretations and variances of the electrical code, checked for each job. |
| Master Electrician | Only a Master Electrician can take out an electrical permit for a contractor in Alberta; a homeowner can for their own home. |
| City of Calgary electrical permits (PL 1219) | A service of 600 A or more, or underground conductors of 1/0 and larger, needs a single-line diagram, shop drawings and the short-circuit current at the service and at every downstream panel and disconnect. |
| Prompt Payment and Construction Lien Act | A proper invoice has eight required items. The owner pays within 28 days of receiving it or disputes it within 14; a contractor pays its subcontractors within 7 days of being paid. |
| NECB 2020 and NBC 2023 Alberta Edition | Lighting power and automatic lighting controls (NECB), emergency lighting and exit signs (NBC), both in force in Alberta since May 1, 2024. |
Your job types, your tools and where the week goes. We say which step we'd set up first, and what we wouldn't.
Usually the takeoff and estimate first, set up on your price book and labour units, and tested on jobs you've already bid, against your own numbers, before it touches a live one.
One fixed monthly price in writing, then month to month with 30 days’ notice. In Canadian dollars, GST extra. How pricing works.
Yes. Use them as a reference or a template. The job is fictional, nothing in the files has been reviewed, signed or sealed, and they come without warranty, so check every value against the CEC 2024, STANDATA and the City of Calgary’s requirements for your own job.
No. It does the counting, typing, drafting and chasing. Your estimator owns the price book and approves every bid. Your Master Electrician reviews and signs the design pack and is still the only one who can take out the permit. The AI never signs anything and never sends anything on its own.
The Canadian Electrical Code, Part I, 2024 as adopted in Alberta (in force since April 1, 2025), Alberta’s STANDATA, and the City of Calgary’s permit requirements, including the PL 1219 checklist for services of 600 A or more. Your Master Electrician confirms what applies to each job.
Yes. PDF drawings, addenda, specifications, scans and photos. Anything it can’t read clearly goes on a list of questions instead of being guessed.
We build around what you already use: your estimating software or spreadsheet, your price book and your title block. The sample takeoff also comes as a CSV, the simplest format to import or paste. In the demo we check what connects directly and what needs an export.
No. It catches what’s visible in the photos and missing against the checklist, like the bonding jumper in the sample. The inspector decides, and your Master Electrician still walks the job.
It depends on your job types, your volume and which steps you want. After the 20-minute demo we send one fixed monthly price in writing for a 90-day paid pilot, then month to month with 30 days’ notice. In Canadian dollars, GST extra. How pricing works.
No. It’s a dramatized example; the company, the people and the job are invented. The sample files are a fuller job of the same kind, also fictional. The sources for the figures are listed below.
Yes. We work in English and Vietnamese. The AI also reads voice notes in many languages, like the Vietnamese one behind the sample change order.
Tell us about your electrical work. A person replies within one business day to set a time, and after the call you get a written quote.
We're in Calgary, on Mountain Time. Weekdays, 9 to 5, Calgary time. We reply within one business day.
Every figure on this page, where it comes from and when we read it.