For commercial HVAC contractors in Alberta

The HVAC AI system: from the first call to the signed drawing.

It turns every call, email, photo and old PDF into one job file, writes the quote your sales manager approves, and drafts the mechanical drawings to the Alberta code for your engineer to review and sign.

Built in Calgary. The AI does the legwork; prices, engineering judgement and the seal stay with your people.

Read the script
  1. Three days to send one quote. Three weeks to draw one system.
  2. Picture a commercial HVAC contractor in Calgary.
  3. A property manager calls. Then emails photos. Then sends plans from 1998.
  4. Our AI pulls it all into one job file.
  5. Then it builds the quote: equipment, labour, materials.
  6. Your sales manager checks it, approves it, and it goes out the same day.
  7. Job won?
  8. The AI drafts the whole HVAC system, built to Alberta code.
  9. Every duct sized. Every airflow. Every note.
  10. Your engineer reviews it, and marks it up.
  11. The AI makes every fix, and the engineer signs off.
  12. Quotes: three days, down to four hours. Drawings: three weeks, down to four days.
  13. Same team. About three times the work.
  14. AI does the legwork. Your people make the calls.
  15. Alpha Seed. We build AI for the complex work in construction, right here in Calgary. Book a demo at alphaseed.ca.

A dramatized example. The contractor, the property manager, the building, the quote and every value on the drawing are invented, and the drawing is an illustration, not an engineered design. The times are estimates for a typical small commercial job (sources). The red stamp is a prop, not an APEGA seal. Drawn in code, no stock footage; the voice is AI-generated.

What changes on a job

Alpha Seed builds an HVAC AI system for commercial contractors in Calgary and across Alberta. It turns calls, emails, site photos and old drawings into one job file, prices the quote from your price book for your sales manager to approve, and drafts the mechanical drawings to the Alberta code for your engineer to review, sign and authenticate. On a typical small commercial job we estimate the quote drops from 3 days to 4 hours and the drawings from 3 weeks to 4 days.

Quote
3 days → 4 hoursFrom the first call to a quote your sales manager has approved and sent.
Drawings
3 weeks → 4 daysFrom the approved quote to a full mechanical set ready for your engineer.
Jobs per team
About 3×On these estimates the office time per job drops about fourfold. We round down.

Estimates for a typical small commercial job, like the one in the film: a two-storey office in NE Calgary getting two new rooftop units and new second-floor ductwork. Your numbers depend on your jobs, so we measure them with you during the pilot. Sources are at the bottom of the page.

Book a 20-minute demo

Tell us what kind of HVAC work you do. A person replies within one business day to set a time.

We reply within one business day.

Where commercial HVAC jobs stall

Not on the roof. In the office, between the first call and the signed drawing.

  1. The job arrives in pieces

    A call, then an email with photos, then a PDF of drawings from 1998. Someone has to read it all and type it into a spreadsheet before anyone can price it, and whatever they miss comes back later as a change order.

  2. The quote waits for the estimator

    Equipment, labour, materials, the crane, the permit, the exclusions. BuildVision, which sells estimating software, puts a manual commercial mechanical estimate at two to four days. BuildOps, which sells software to the trade, says quote speed is the single largest driver of win rate on service work.

  3. The drawings wait for the designer, then the engineer

    Loads, equipment, duct sizes, diffusers, schedules, notes and code checks, then redlines back and forth. One engineering firm's published timeline puts a commercial fit-out design at two to three weeks. Meanwhile the client waits and the crew has nothing booked.

None of it is hard for your people. It's slow because it's reading, typing, checking and retyping. That's the part the AI takes.

How the HVAC AI system works

Six steps, in the same order as the film. At every step a person decides what goes out.

  1. 01 Intake

    One job file from every call, email and PDF

    AI Reads the call notes, the emails, the site photos and the old drawings, and fills one job file: the building, floors and areas, the existing units and their nameplates, the problem, the deadline and who to talk to. Anything it can't read clearly goes on a short list of questions instead of being guessed.

    Your people Your coordinator confirms the scope or answers the questions.

  2. 02 Quote

    A quote in your format, from your price book

    AI Prices the job from your price book, your labour units and your supplier pricing: equipment, labour, materials, crane and permit, with your standard exclusions and clarifications. Every line shows where its number came from.

    Your people Your sales manager checks, edits and approves. Nothing is sent without that approval.

  3. 03 Design basis

    Codes and assumptions before any duct

    AI Writes the design basis first: NBC (Alberta Edition) 2023, NECB 2020, CSA B149.1 for the gas-fired units, outdoor air to ASHRAE 62.1 as the building code references it, and the occupancy and loads of each space.

    Your people Your engineer can check the assumptions before the details.

  4. 04 Drawings

    The whole system, drafted

    AI Lays out the rooftop units, trunks and branches; sizes every duct; gives every outlet its airflow; places volume dampers, flex connections, VAV boxes and thermostats; and fills in the schedules, keyed notes and general notes, in your title block and to your drafting standards.

    Your people Your designer adjusts whatever needs a human eye.

  5. 05 Review

    Redlines in, fixes out

    AI Takes the engineer's markup the way it's given today, makes every fix as a tracked revision, and lists what changed against each comment.

    Your people Your engineer reviews, signs and authenticates. The AI never applies a seal.

  6. 06 Handoff

    Permit, purchasing and the field

    AI Packages the set for the permit, the material list for purchasing and the job file for the crew, so nobody types it all in again.

    Your people Your team submits, orders and schedules.

Inside the drawing

What the AI puts on the sheet before your engineer sees it. Frames from the film.

Blueprint-style HVAC plan of an office floor: duct sizes such as 600 × 400, 450 × 300 and Ø250 on the trunks and branches, volume dampers at the take-offs, and room names with their numbers.
Every duct sized. Trunks and branches sized in millimetres, a volume damper at every take-off, flex to each diffuser, and room names placed where they don't sit on the ductwork.
The notes area of the drawing: the design basis, eight numbered keyed notes, a legend of HVAC symbols and an air outlet schedule.
Every note. The design basis, keyed notes tied to numbered hexagons on the plan, a legend, an air outlet schedule with face and neck sizes and airflow, and a column of general notes.
The HVAC plan with three revision clouds and the engineer's three comments, each marked done for revision B.
The engineer's markup, done. Three clouds, three comments: add a fire damper, upsize the corridor trunk, recheck the outdoor air for a 20-person meeting room. Each fix made and marked done as revision B.
Title block with revision B, the status For Review struck through, and a red Reviewed stamp; drawn by AI, quote checked by the sales manager, reviewed by the engineer.
Signed off. The title block records who did what: drawn by the AI, the quote checked by the sales manager, the drawings reviewed by the engineer. A real set carries your engineer's authentication.

From the film's example job. The building and every value on the sheet are invented; it's an illustration, not an engineered design.

Bring a job like yours to the demo

Tell us which part eats your office's week: intake, quotes or drawings. In 20 minutes we show you how the system would handle a job like yours, and which step we'd set up first.

What stays with your people

The AI does the legwork. The decisions that carry your name stay where they are.

Prices
Your estimator owns the price book and the labour units. The AI prices from them; it doesn't make up a number.
What reaches a customer
Every quote and every drawing set waits for a person's approval. Nothing goes out on its own.
Engineering judgement and the seal
Your engineer reviews, signs and authenticates, as APEGA requires for final engineering documents. The AI never applies a seal.
Your files
Your price book, your drawings and your job files remain yours.

Built for Alberta's codes

The design basis the system starts from. Your engineer confirms what applies to each job.

Code or ruleWhat it covers
National Building Code – 2023 Alberta EditionAlberta's building code, in force since May 1, 2024. Part 6 covers heating, ventilating and air conditioning.
National Energy Code of Canada for Buildings 2020Energy efficiency for new buildings outside Part 9, in force in Alberta from the same date.
ANSI/ASHRAE 62.1-2016Outdoor air rates for each space, referenced in Part 6 of the 2020 National Building Code that the Alberta Edition is based on.
CSA B149.1The natural gas and propane installation code, for gas-fired rooftop units and their venting.
APEGA authenticationFinal engineering documents are stamped, signed and dated by the responsible professional.
City of Calgary mechanical permitRequired for HVAC installations in new buildings and renovations. On an office interior renovation over 500 m², the City requires professional involvement in the mechanical work, and those drawings must be stamped.

Who it's for

A good fit

  • Commercial HVAC and mechanical contractors in Calgary and across Alberta
  • Design-build, tenant improvements, rooftop unit replacements and light commercial work
  • Teams quoting several jobs a week, where the estimator and the drafter are the bottleneck
  • Contractors with an engineer on staff, or a partner firm that stamps their drawings

Tell us first if

  • Your work is mostly large projects coordinated in BIM with the other trades. We’ll say on the call what fits and what doesn’t.
  • Nobody reviews your designs. The system drafts; someone qualified still has to review and authenticate.
  • You do residential work only. Our HVAC and plumbing page covers after-hours calls, booking and Google Maps.

How we start

  1. A 20-minute demo

    Your job types, your tools and where the week goes. We say which step we'd set up first, and what we wouldn't.

  2. One step, on your own data

    Usually intake and quoting first, set up on your price book and your templates, and tested on your past jobs before it touches a live one.

  3. A 90-day paid pilot

    One fixed monthly price in writing, then month to month with 30 days’ notice. In Canadian dollars, GST extra. How pricing works.

Questions contractors ask

Does the AI replace our estimator or our engineer?

No. It does the reading, typing and drafting. Your estimator owns the price book, your sales manager approves every quote, and your engineer reviews, signs and authenticates every drawing set, as APEGA requires. The AI never applies a seal and never sends anything on its own.

Which codes does it design to?

The design basis starts from the National Building Code – 2023 Alberta Edition, NECB 2020, CSA B149.1 for gas-fired equipment and ASHRAE 62.1-2016 for ventilation, which the building code references. Your engineer confirms what applies to each job and can change the assumptions before any duct is drawn.

Can it read old drawings and site photos?

Yes. It reads PDF drawings, scans and photos and pulls out what’s legible: rooms and areas, existing equipment, nameplate data, notes. Anything it can’t read clearly goes on a list of questions instead of being guessed.

Does it work with our software?

We build around what you already use: your email and phone, your estimating spreadsheet or software, your CAD standards and your title block. In the demo we check what connects directly and what needs an export.

What does it cost?

It depends on your job types, your volume and which steps you want. After the 20-minute demo we send one fixed monthly price in writing for a 90-day paid pilot, then month to month with 30 days’ notice. In Canadian dollars, GST extra. How pricing works.

Where do you usually start?

With intake and quoting. They pay back fastest, and they teach the system your prices and your standards before it drafts anything.

Is the film a real customer?

No. It’s a dramatized example: the company, the people, the building and the numbers on the drawing are invented, and the times are estimates for a typical small commercial job. The sources are listed below.

Can we talk in Vietnamese?

Yes. We work in English and Vietnamese.

Book a 20-minute demo

Tell us about your HVAC work. A person replies within one business day to set a time, and after the call you get a written quote.

  1. You tell us how a job moves today, from the first call to the stamped set.
  2. We walk through a job like yours: the job file, the quote and the drawing it would produce.
  3. We say what we’d set up first, and what isn’t worth paying for yet.
  4. You get a written quote: one fixed monthly price for the scope we agreed.
Alpha Seed Inc.
407 9 Ave SE
Calgary, AB T2G 2K7
support@alphaseed.ca
Weekdays, 9 to 5, Calgary time

We're in Calgary, on Mountain Time. Weekdays, 9 to 5, Calgary time. We reply within one business day.

We reply within one business day.

Sources

Every figure on this page, where it comes from and when we read it.

  • Estimating time: BuildVision, HVAC estimating (“Commercial mechanical estimates that take 2-4 days of manual work can typically be done in 4-8 hours”; a software vendor’s figures). Read November 20, 2026.
  • Quote speed and win rate: BuildOps, Quote in 24 hours, August 4, 2026 (a software vendor, citing an industry report). Read November 20, 2026.
  • Design time: CCC Engineering (Australia), building services engineering timeline: commercial fit-out, 2 to 3 weeks. Drafting time cut from 40 hours to 8: a customer quoted by EVOLVE Mechanical on SMACNA, January 23, 2026 (a vendor’s announcement).
  • Codes in force: Government of Alberta, Building codes and standards (NBC–AE 2023 and NECB 2020 from May 1, 2024); National Research Council, NBC 2023 Alberta Edition.
  • Ventilation reference: City of Kitchener, Building bulletin 2025-09, October 22, 2025 (the 2020 NBC references ASHRAE 62.1-2016).
  • Engineer’s authentication: APEGA, Authenticating professional work products.
  • Permits: City of Calgary, Mechanical permits and the office interior renovation checklist. Read November 20, 2026.
  • The times in the film and on this page are Alpha Seed’s estimates for a typical small commercial job, built from the figures above. They are not measurements from a client.