For architecture firms in Calgary and Alberta
From lot to permit. The agents draft. Your architects decide.
AI agents that read a lot's zoning and draft site options, redraw the plans after your mark-up, check the permit package against the City's checklist and draft an answer to every review comment.
Built in Calgary. The agents draft and check; design decisions, signatures and the seal stay with your architects.
- 0:00What can we build here?
- 0:12The zoning, read
- 0:19Three options, with suites and parking
- 0:25The architect picks one and marks it up
- 0:29The plans, redrawn
- 0:32The package, checked before submitting
- 0:4027 review comments, answers drafted
- 0:54Four decisions, signed in three days
- 1:00Issued for permit
- 1:06Alpha Seed
Jump to a chapter, or download the sample project the film is based on.
Read the script
- Picture an architecture firm in Calgary.
- A developer sends an address, and one question: what can we build here?
- Usually, that answer takes a week. The permit takes months.
- This time, an Alpha Seed agent reads the lot's zoning: height, setbacks, density.
- By the afternoon, it has drafted three options, with units and parking for each.
- The architect picks one, and marks what to change.
- The agent redraws the plans.
- Before anything is submitted, it checks the package against the City's requirement list.
- One missing signature. Fixed.
- Weeks later, the City's review comes back: 27 comments.
- The agent matches each one to its sheet, and drafts the answers.
- Four need a design decision. Those wait for the architect.
- She decides, signs, and it goes back in three days.
- The agents draft. The architect decides, and seals.
- Alpha Seed. AI for the complex work in construction. Built in Calgary.
- Book a demo at alphaseed.ca.
A dramatized example. The firm, the lot, the people and every figure are fictional, and the times are estimates (sources). The documents on screen are mock-ups: the red stamp is the architect’s drawing status, not a City approval, and no seal is shown. Drawn in code, no stock footage; the voice is AI-generated. The project continues in the sample files.
What changes on a project
Alpha Seed sets up AI agents for architecture firms in Calgary and across Alberta. They read a lot's zoning and draft site options with suites and parking, redraw the chosen option after your architect's mark-up, check the permit package against the City's checklist before you submit, and draft an answer to every review comment. Your architects make the design decisions, sign and seal. On a project like the sample below, we estimate site options drop from about a week to an afternoon, and a review response from about two weeks to three days.
- Site options
- 1 week → 1 afternoonFrom an address to three massing options with suites, parking and floor area, ready for your architect to choose.
- Review response
- 2 weeks → 3 daysFrom the City's detailed review to a signed response, every comment answered and tied to its sheet.
- The City's part
- UnchangedCirculation and decision times stay with the City. The agents shorten your side: incomplete packages and slow answers.
Estimates for a project like the sample: a six-storey mixed-use building in Calgary. Your numbers depend on your projects, so we measure them with you during the pilot. Sources are at the bottom of the page.
Book a 20-minute demo
Tell us what kind of projects you design. A person replies within one business day to set a time.
Where architecture projects stall
Not at the drawing board. In the paperwork between the drawings and the permit.
-
The zoning keeps moving
Council repealed citywide rezoning on April 8, 2026, and on August 4 almost every property went back to the zoning it had before. A new Zoning Bylaw is being written to replace Land Use Bylaw 1P2007. Feasibility done before August needs a second look, and each change makes "what can we build here?" a longer answer.
-
An incomplete package costs a month
Every building permit application is prescreened. If anything is missing, the applicant gets 30 days to provide it, and the application may be refused if it doesn't arrive. The checklists exist; checking a full set against them, sheet by sheet and form by form, is the slow part.
-
The review clock counts your days too
A multi-disciplinary development permit took 114 days on average from July to September 2026, against a 120-day target. The City counts the applicant's review and response time inside that number, so a review letter that waits two weeks for answers adds two weeks. For a new mixed-use building, the City's own estimate is 13 to 14 months of approvals.
None of this needs an architect's judgement until a design question comes up. It's reading, checking, cross-referencing and retyping. That's the part the agents take.
How the agents work on a project
Six steps, in the same order as the film. At every step the agent drafts and your architect decides.
-
01 Zoning
Read the lot
AI Reads the parcel's land use district, the bylaw rules and the plan policies that apply, and draws the buildable envelope: height, setbacks, floor area. Direct Control districts and anything unclear go on a list of questions instead of being guessed.
Your people Your architect confirms the reading.
-
02 Options
Draft the options
AI Draws two or three massing options, with suites, storeys, parking and floor area for each, and the trade-offs side by side.
Your people Your architect picks one and marks what to change.
-
03 Drawings
Redraw the plans
AI Redraws the chosen option after the mark-up: suite layouts on every floor, the parkade, roof, elevations, sections and a shadow study, in your title block. Suites, areas and stalls are counted from the drawings, so the schedules match the sheets.
Your people Your architect reviews the set the way they'd review a junior's or a consultant's.
-
04 Package
Check before submitting
AI Checks the package against the City's checklist for that application type, and the drawings against each other and the form: sheet list, titles, areas, the building classification, signatures.
Your people Your team fixes what's missing and submits.
-
05 Review
Answer the review
AI Splits the City's review letter into tracked comments, matches each one to its sheet, and drafts the answers and the drawing revisions. When a comment needs a design decision, it lays out the options and what each costs in suites or area, then waits.
Your people Your architect decides the design questions, edits and signs.
-
06 Issue
Re-issue the set
AI Updates the sheet list, the revision clouds and the transmittal for the re-issue, and keeps the comment log for the next round. It never applies a seal.
Your people Your architect seals and issues the drawings as the architect of record.
Download the sample project
Lot 7 is a fictional six-storey mixed-use building in Calgary, the project from the film. One model produced every file, so the numbers agree from file to file: 68 suites, 43 parking stalls, a floor area ratio of 2.73. Open them the way you'd open a consultant's set.
-
-
-
2 · Editable
Typical floor plan (CAD)
Levels 2 to 5 as a DXF in millimetres: walls, doors, glazing, fixtures, suite areas, grids and dimensions, each on its own layer.
-
3 · Counted from the drawings
Schedules and comment tracker
Areas by level, the suite list, parking against requirements, the three options, the package check and the 27-comment tracker, all with live formulas.
-
-
A fictional project: the firm, the client, the lot, the zoning values and the City review are invented. The drawings are illustrations, not for construction, permit or tender, and carry no seal. Nothing here is legal or code advice.
Inside the sample project
Four close-ups from the files above. Each one opens the file it comes from.
From the sample project. Every name and value is invented; the drawings are illustrations, not a design for construction.
Bring one of your own review letters to the demo
Take out anything confidential. In 20 minutes we show how the agents would track it, match each comment to its sheet and draft the answers, and which step we'd set up first.
What stays with your architects
The agents prepare the work. The decisions and the responsibility stay where they are.
- Design decisions
- Which option, which suite mix, what to change. When a review comment needs a decision, the agent lays out the options and waits.
- The seal
- Only an architect registered with the Alberta Association of Architects may seal architectural documents. The agents never apply a seal; the seal box on every sample sheet is empty for that reason.
- What leaves the office
- Nothing goes to the City, a client or a consultant until someone on your team approves it.
- The City's timeline
- Circulation, notice and appeal periods stay as they are. The agents shorten your side: incomplete packages and slow answers.
Built for Calgary's process and Alberta's rules
What the agents check against. Your architect confirms what applies to each project.
| Code or rule | What it covers |
|---|---|
| Land Use Bylaw 1P2007 | Calgary's zoning bylaw: districts, height, setbacks, density and parking. The City is writing a new Zoning Bylaw to replace it. |
| The repeal of citywide rezoning | Council repealed it on April 8, 2026, and almost every property went back to its previous zoning on August 4, 2026. |
| The City's application checklists | What each application type has to include. A building permit application that's missing information gets 30 days to be completed and may be refused after that. |
| National Building Code – 2023 Alberta Edition | Alberta's building code, in force since May 1, 2024: occupancy, fire separations, exits and accessibility. |
| National Energy Code of Canada for Buildings 2020 | Energy efficiency for buildings outside Part 9, in force in Alberta from the same date. |
| Architects Act (Alberta) | Registration with the Alberta Association of Architects is mandatory to practise architecture, and only registered members may affix an architect's seal to architectural documents. |
| RAIC statement on AI, April 28, 2026 | AI may assist, but it doesn't replace the architect's duty of care, professional judgment, ethical responsibility or accountability. |
Who it's for
A good fit
- Architecture firms of 5 to 50 people in Calgary and across Alberta
- Multi-family, mixed-use, commercial, infill and office-to-residential conversion projects
- Firms that take several projects a year through development and building permits
- Studios where senior people spend their evenings on review letters, checklists and schedules
Tell us first if
- You want the AI to design the building. It drafts options and documents; your architects make the design decisions.
- Your projects never go through a Calgary permit. The checks are built around the City’s process; elsewhere in Alberta we start from the municipality’s own checklists.
- You’re a large firm with its own automation team. We’ll say on the call what we’d add and what you already have.
How we start
-
A 20-minute demo
Bring a review letter or an address. We show what the agents would do with it, which step we'd set up first, and what we wouldn't.
-
One step, on one live project
Usually the package check or the review response first, set up on your title block, your sheet list and your standards, and tested on a past project before it touches a live one.
-
A 90-day paid pilot
One fixed monthly price in writing, then month to month with 30 days’ notice. In Canadian dollars, GST extra. How pricing works.
Questions architects ask
Can AI really design a building?
It can draft early design quickly: massing options that fit the zoning, suite layouts, unit counts and parking. It can’t make the design judgement or carry the responsibility for it. In every sample file, the decisions are the architect’s.
Does it replace our technologists or our architects?
No. The agents do the reading, checking and drafting. Your team decides, edits and signs, and your architect seals. The hours saved go back into design.
Will the City accept responses prepared with AI?
The City reviews what you submit, and your architect stays responsible for it. The agents prepare drafts and checks; your team edits, approves and signs. The RAIC said the same in April 2026: AI may assist, but it doesn’t replace the architect’s duty of care.
Does it work with our software?
The agents work from what your software already exports, such as PDF sets, sheet lists and schedules, and hand back PDF, Excel and DXF, as in the sample project. In the demo we check what connects directly and what needs an export.
Who seals the drawings?
Your architect. In Alberta, only architects registered with the Alberta Association of Architects may seal architectural documents. The agents never apply a seal; the seal box on every sample sheet is empty for that reason.
Where do you usually start?
With the package check or the review response. They’re heavy on paperwork, easy to measure, and they teach the agents your standards before they draft anything.
What does it cost?
It depends on your projects, your volume and which steps you want. After the 20-minute demo we send one fixed monthly price in writing for a 90-day paid pilot, then month to month with 30 days’ notice. In Canadian dollars, GST extra. How pricing works.
Is Lot 7 a real project?
No. The firm, the client, the lot, the zoning values and the City review are fictional, and the times are estimates. The work is real: one model drove every drawing, report and table in the sample, which is why the numbers agree from file to file.
Can we talk in Vietnamese?
Yes. We work in English and Vietnamese.
Book a 20-minute demo
Tell us about your projects. A person replies within one business day to set a time, and after the call you get a written quote.
- You tell us how a project moves today, from the first call about a lot to the permit.
- We walk through a project like yours: the site options, the package check and the review response it would produce.
- We say what we’d set up first, and what isn’t worth paying for yet.
- You get a written quote: one fixed monthly price for the scope we agreed.
407 9 Ave SE
Calgary, AB T2G 2K7
support@alphaseed.ca
Weekdays, 9 to 5, Calgary time
We're in Calgary, on Mountain Time. Weekdays, 9 to 5, Calgary time. We reply within one business day.
Sources
Every figure on this page, where it comes from and when we read it.
- Approval times: City of Calgary, Development approval timelines, July 1 to September 30, 2026 (multi-disciplinary development permits: 114 days on average, 120-day target, 65% within target; “The total days include both City and Applicant review and response times”). Read November 21, 2026.
- Time to start building: City of Calgary, Timelines (a new mixed-use building: 13 to 14 months on average, if the applications are ready and the land use is in place). Read November 21, 2026.
- Prescreen and 30 days: City of Calgary, Permit process FAQ. Read November 21, 2026.
- Rezoning: City of Calgary, Rezoning for Housing (repealed April 8, 2026; in effect August 4, 2026). The new Zoning Bylaw: City of Calgary, City Building Program. Read November 21, 2026.
- Codes in force: Government of Alberta, Building codes and standards (NBC–AE 2023 and NECB 2020 from May 1, 2024).
- The seal: alis, Architect (Architects Act and General Regulation). Read November 21, 2026.
- AI and professional responsibility: RAIC, Statement on artificial intelligence in architecture, April 28, 2026.
- Shadow study: sun positions from NOAA’s General Solar Position Calculations.
- The times in the film and on this page (site options in an afternoon instead of about a week; a review response in three days instead of about two weeks) are Alpha Seed’s estimates for a project like the sample. They are not measurements from a client.